IAC Assessment: IP0029
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IP0029
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Indiana University-Purdue University
Assessment Year 2014
Principal Product Hose Reels
NAICS 332912 - Fluid Power Valve and Hose Fitting Manufacturing
SIC 3499 - Fabricated Metal Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 200
Plant Area (Sq.Ft.) 134,106
Annual Production 4,200,000 Pieces
Production Hrs. Annual 4,200
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $191,136 2,404,480 kWh $0.08
Electricity Demand $51,602 7,217 kW-months/year $7.15
Electricity Fees $2,766 - $ -
Natural Gas $75,147 10,207 MMBtu $7.36
TOTAL ENERGY COSTS $403,359
RECOMMENDED SAVINGS* $138,233 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $34,385
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$9,363
Cost:
$210
$3,063 38,535 - - $6,300 875 - - $3,063
38,535
kWh
-
-
kW-months/year
$6,300
875
MMBtu
-
-
lb
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,383
Cost:
$92
$6,383 80,292 - - - - - - $6,383
80,292
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$980
Cost:
$122
$980 12,326 - - - - - - $980
12,326
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
04: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$82,707
Cost:
$12,435
- - - - - - $82,707 259,283 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$82,707
259,283
lb
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,997
Cost:
$1,104
- - - - $2,997 416 - - -
-
kWh
-
-
kW-months/year
$2,997
416
MMBtu
-
-
lb
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,419
Cost:
$512
$1,129 14,196 $290 41 - - - - $1,129
14,196
kWh
$290
41
kW-months/year
-
-
MMBtu
-
-
lb
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,432
Cost:
$4,014
$6,432 64,282 - - - - - - $6,432
64,282
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$27,953
Cost:
$54,929
$22,141 278,527 $5,812 813 - - - - $22,141
278,527
kWh
$5,812
813
kW-months/year
-
-
MMBtu
-
-
lb
TOTAL RECOMMENDED Savings:
$138,233
Cost:
$73,418
$40,128 488,158 $6,102 854 $9,297 1,291 $82,707 259,283 $40,128
488,158
kWh
$6,102
854
kW-months/year
$9,297
1,291
MMBtu
$82,707
259,283
lb
TOTAL IMPLEMENTED Savings:
$34,385
Cost:
$58,943
$28,573 342,809 $5,812 813 - - - - $28,573
342,809
kWh
$5,812
813
kW-months/year
-
-
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)