IAC Assessment: IP0058
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IP0058
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Indiana University-Purdue University
Assessment Year 2016
Principal Product Residential Furnace & fan coils
NAICS 333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585 - Refrigeration And Heating Equipment
Sales >$500,000,000
# of Employees 500
Plant Area (Sq.Ft.) 600,000
Annual Production 1,600,000 Pieces
Production Hrs. Annual 5,052
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,073,115 21,498,400 kWh $0.05
Electricity Demand $501,315 44,684 kW-months/year $11.22
Electricity Fees $4,433 - $ -
Natural Gas $414,338 82,985 MMBtu $4.99
TOTAL ENERGY COSTS $2,031,605
RECOMMENDED SAVINGS* $98,481 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$10,007
Cost:
$326
$10,007 200,452 - - - - - - - - - - $10,007
200,452
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$256
Cost:
$51
$256 5,138 - - - - - - - - - - $256
5,138
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
03: 2.3192 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS Savings:
$30,281
Cost:
$6,819
$624 12,500 $31,820 2,836 - - - - - - $(-2,163) - $624
12,500
kWh
$31,820
2,836
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
$(-2,163)
-
$
04: 2.2426 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR Savings:
$11,137
Cost:
$4,626
- - - - - - $11,137 2,231 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$11,137
2,231
MMBtu
-
-
Tgal
-
-
$
05: 3.4145 USE MAGNETIC TECHNOLOGY TO TREAT WATER Savings:
$227
Cost:
$255
- - - - - - - - $227 62 - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$227
62
Tgal
-
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$46,574
Cost:
$102,745
- - - - $46,574 - - - - - - - -
-
kWh
-
-
kW-months/year
$46,574
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$98,481
Cost:
$114,822
$10,887 218,090 $31,820 2,836 $46,574 - $11,137 2,231 $227 62 $(-2,163) - $10,887
218,090
kWh
$31,820
2,836
kW-months/year
$46,574
-
$
$11,137
2,231
MMBtu
$227
62
Tgal
$(-2,163)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Ancillary Material Cost