IAC logo
IAC Assessment: IP0071
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IP0071
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Indiana University-Purdue University
Assessment Year 2016
Principal Product Hot Mix Asphalt
NAICS 324121 - Asphalt Paving Mixture and Block Manufacturing
SIC 2951 - Asphalt Paving Mixtures And Blocks
Sales $1,000,000-$5,000,000
# of Employees 30
Plant Area (Sq.Ft.) 42,800
Annual Production 84,000 Units
Production Hrs. Annual 1,980
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $26,604 336,181 kWh $0.08
Electricity Demand $24,377 3,125 kW-months/year $7.80
Electricity Fees $1,757 - $ -
Natural Gas $126,878 25,778 MMBtu $4.92
TOTAL ENERGY COSTS $179,616
RECOMMENDED SAVINGS* $11,996 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,630
Cost:
$1,030
$1,630 20,770 - - - - $1,630
20,770
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,868
Cost:
$5,332
$6,868 87,516 - - - - $6,868
87,516
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,687
Cost:
$2,183
- - - - $2,687 546 -
-
kWh
-
-
kW-months/year
$2,687
546
MMBtu
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$106
Cost:
$136
$106 1,345 - - - - $106
1,345
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$705
Cost:
$2,374
$440 5,617 $265 34 - - $440
5,617
kWh
$265
34
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$11,996
Cost:
$11,055
$9,044 115,248 $265 34 $2,687 546 $9,044
115,248
kWh
$265
34
kW-months/year
$2,687
546
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas