Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Indiana University-Purdue University
Assessment Year 2018
Principal Product Adhesive
NAICS 325520 - Adhesive Manufacturing
SIC 2891 - Adhesives And Sealants
Sales $10,000,000-$50,000,000
# of Employees 109
Plant Area (Sq.Ft.) 120,000
Annual Production 19,798,914 Pieces
Production Hrs. Annual 4,368
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $212,070 3,386,222 kWh $0.06
Electricity Demand $102,767 9,322 kW-months/year $11.02
Electricity Fees $2,443 - $ -
Natural Gas $25,269 4,239 MMBtu $5.96
TOTAL ENERGY COSTS $357,045
RECOMMENDED SAVINGS* $56,926 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,199
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
01: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$3,602
Cost:
$25
$1,132 18,246 - - - - $2,470 420 - - $1,132
18,246
kWh
-
-
kW-months/year
-
-
$
$2,470
420
MMBtu
-
-
Tgal
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$10,685
Cost:
$275
$7,124 114,863 $3,561 316 - - - - - - $7,124
114,863
kWh
$3,561
316
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
03: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$3,492
Cost:
$600
- - - - - - - - $3,492 293 -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$3,492
293
Tgal
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$7,330
Cost:
$4,122
- - - - $7,330 - - - - - -
-
kWh
-
-
kW-months/year
$7,330
-
$
-
-
MMBtu
-
-
Tgal
05: 4.812 APPLY FOR INVESTMENT INCENTIVES Savings:
$161
Cost:
$100
- - - - $161 - - - - - -
-
kWh
-
-
kW-months/year
$161
-
$
-
-
MMBtu
-
-
Tgal
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$183
Cost:
$639
$121 1,102 $62 13 - - - - - - $121
1,102
kWh
$62
13
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,259
Cost:
$15,632
$2,828 45,602 $1,431 127 - - - - - - $2,828
45,602
kWh
$1,431
127
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
08: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$25,428
Cost:
$6,125
$16,961 273,480 $8,467 751 - - - - - - $16,961
273,480
kWh
$8,467
751
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
09: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,786
Cost:
$1,576
$1,027 9,360 $529 108 - - $230 (-34) - - $1,027
9,360
kWh
$529
108
kW-months/year
-
-
$
$230
(-34)
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$56,926
Cost:
$29,094
$29,193 462,653 $14,050 1,315 $7,491 - $2,700 386 $3,492 293 $29,193
462,653
kWh
$14,050
1,315
kW-months/year
$7,491
-
$
$2,700
386
MMBtu
$3,492
293
Tgal
TOTAL IMPLEMENTED Savings:
$22,199
Cost:
$16,632
$11,084 178,711 $4,992 443 $161 - $2,470 420 $3,492 293 $11,084
178,711
kWh
$4,992
443
kW-months/year
$161
-
$
$2,470
420
MMBtu
$3,492
293
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal