Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Indiana University-Purdue University |
---|---|
Assessment Year | 2018 |
Principal Product | Deli Salads, Refrigerated Side Dishes, Cake Icing |
NAICS | 311999 - All Other Miscellaneous Food Manufacturing |
SIC | 2099 - Food Preparations, Nec |
Sales | $100,000,000-$500,000,000 |
# of Employees | 250 |
Plant Area (Sq.Ft.) | 108,000 |
Annual Production | 93,000,000 Pounds |
Production Hrs. Annual | 6,120 |
Location (State) | IN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $412,962 | 13,358,256 | kWh | $0.03 |
Electricity Demand | $628,306 | 25,222 | kW-months/year | $24.91 |
Electricity Fees | $4,017 | - | $ | - |
Natural Gas | $50,170 | 42,691 | MMBtu | $1.18 |
TOTAL ENERGY COSTS | $1,440,178 | |||
RECOMMENDED SAVINGS* | $44,143 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $43,514 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) |
Savings: $4,310 Cost: $596 |
- | - | - | - | - | - | $4,310 | 826 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$4,310 826 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,840 Cost: $3,587 |
$713 | 23,072 | $1,127 | 45 | - | - | - | - |
$713 23,072 kWh |
$1,127 45 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $629 Cost: $1,485 |
- | - | - | - | $629 | 533 | - | - |
- - kWh |
- - kW-months/year |
$629 533 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR |
Savings: $957 Cost: $2,201 |
- | - | - | - | $957 | 811 | - | - |
- - kWh |
- - kW-months/year |
$957 811 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,646 Cost: $9,560 |
$3,646 | 117,950 | - | - | - | - | - | - |
$3,646 117,950 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,610 Cost: $7,858 |
$1,748 | 56,544 | $862 | 35 | - | - | - | - |
$1,748 56,544 kWh |
$862 35 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $10,878 Cost: $39,406 |
$4,825 | 156,111 | $6,053 | 243 | - | - | - | - |
$4,825 156,111 kWh |
$6,053 243 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $582 Cost: $2,219 |
$203 | 6,566 | $379 | 15 | - | - | - | - |
$203 6,566 kWh |
$379 15 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $18,691 Cost: $85,000 |
- | - | - | - | $18,691 | 15,840 | - | - |
- - kWh |
- - kW-months/year |
$18,691 15,840 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $44,143 Cost: $151,912 |
$11,135 | 360,243 | $8,421 | 338 | $20,277 | 17,184 | $4,310 | 826 | $11,135 360,243 kWh |
$8,421 338 kW-months/year |
$20,277 17,184 MMBtu |
$4,310 826 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $43,514 Cost: $150,427 |
$11,135 | 360,243 | $8,421 | 338 | $19,648 | 16,651 | $4,310 | 826 | $11,135 360,243 kWh |
$8,421 338 kW-months/year |
$19,648 16,651 MMBtu |
$4,310 826 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal |