IAC logo
IAC Assessment: IP0107
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IP0107
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Indiana University-Purdue University
Assessment Year 2018
Principal Product Deli Salads, Refrigerated Side Dishes, Cake Icing
NAICS 311999 - All Other Miscellaneous Food Manufacturing
SIC 2099 - Food Preparations, Nec
Sales $100,000,000-$500,000,000
# of Employees 250
Plant Area (Sq.Ft.) 108,000
Annual Production 93,000,000 Pounds
Production Hrs. Annual 6,120
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $412,962 13,358,256 kWh $0.03
Electricity Demand $628,306 25,222 kW-months/year $24.91
Electricity Fees $4,017 - $ -
Natural Gas $50,170 42,691 MMBtu $1.18
TOTAL ENERGY COSTS $1,440,178
RECOMMENDED SAVINGS* $44,143 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $43,514
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$4,310
Cost:
$596
- - - - - - $4,310 826 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,310
826
Tgal
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,840
Cost:
$3,587
$713 23,072 $1,127 45 - - - - $713
23,072
kWh
$1,127
45
kW-months/year
-
-
MMBtu
-
-
Tgal
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$629
Cost:
$1,485
- - - - $629 533 - - -
-
kWh
-
-
kW-months/year
$629
533
MMBtu
-
-
Tgal
04: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$957
Cost:
$2,201
- - - - $957 811 - - -
-
kWh
-
-
kW-months/year
$957
811
MMBtu
-
-
Tgal
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,646
Cost:
$9,560
$3,646 117,950 - - - - - - $3,646
117,950
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,610
Cost:
$7,858
$1,748 56,544 $862 35 - - - - $1,748
56,544
kWh
$862
35
kW-months/year
-
-
MMBtu
-
-
Tgal
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,878
Cost:
$39,406
$4,825 156,111 $6,053 243 - - - - $4,825
156,111
kWh
$6,053
243
kW-months/year
-
-
MMBtu
-
-
Tgal
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$582
Cost:
$2,219
$203 6,566 $379 15 - - - - $203
6,566
kWh
$379
15
kW-months/year
-
-
MMBtu
-
-
Tgal
09: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$18,691
Cost:
$85,000
- - - - $18,691 15,840 - - -
-
kWh
-
-
kW-months/year
$18,691
15,840
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$44,143
Cost:
$151,912
$11,135 360,243 $8,421 338 $20,277 17,184 $4,310 826 $11,135
360,243
kWh
$8,421
338
kW-months/year
$20,277
17,184
MMBtu
$4,310
826
Tgal
TOTAL IMPLEMENTED Savings:
$43,514
Cost:
$150,427
$11,135 360,243 $8,421 338 $19,648 16,651 $4,310 826 $11,135
360,243
kWh
$8,421
338
kW-months/year
$19,648
16,651
MMBtu
$4,310
826
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal