IAC logo
IAC Assessment: IP0116
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IP0116
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Indiana University-Purdue University
Assessment Year 2019
Principal Product Potable Drinking Water
NAICS 221310 - Water Supply and Irrigation Systems
SIC 4941 - Water Supply
Sales $10,000,000-$50,000,000
# of Employees 6
Plant Area (Sq.Ft.) 1,540,170
Annual Production 5,794,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $680,712 9,560,242 kWh $0.07
Electricity Demand $56,317 22,313 kW-months/year $2.52
Electricity Fees $669 - $ -
Natural Gas $16,476 2,143 MMBtu $7.69
TOTAL ENERGY COSTS $754,174
RECOMMENDED SAVINGS* $130,128 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $124,562
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$308
Cost:
-
- - - - $308 40 -
-
kWh
-
-
kW-months/year
$308
40
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,151
Cost:
$23
$5,151 54,283 - - - - $5,151
54,283
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$415
Cost:
$680
$415 4,375 - - - - $415
4,375
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,878
Cost:
$14,599
$6,648 88,427 $230 119 - - $6,648
88,427
kWh
$230
119
kW-months/year
-
-
MMBtu
05: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$117,376
Cost:
$1,431,096
$117,376 1,566,266 - - - - $117,376
1,566,266
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$130,128
Cost:
$1,446,398
$129,590 1,713,351 $230 119 $308 40 $129,590
1,713,351
kWh
$230
119
kW-months/year
$308
40
MMBtu
TOTAL IMPLEMENTED Savings:
$124,562
Cost:
$1,445,695
$124,024 1,654,693 $230 119 $308 40 $124,024
1,654,693
kWh
$230
119
kW-months/year
$308
40
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas