Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Indiana University-Purdue University |
---|---|
Assessment Year | 2019 |
Principal Product | Projector screens |
NAICS | 325992 - Photographic Film, Paper, Plate, and Chemical Manufacturing |
SIC | 3861 - Photographic Equipment And Supplies |
Sales | $50,000,000-$100,000,000 |
# of Employees | 325 |
Plant Area (Sq.Ft.) | 300,000 |
Annual Production | 279,215 Units |
Production Hrs. Annual | 4,160 |
Location (State) | IN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $227,584 | 3,000,792 | kWh | $0.08 |
Electricity Demand | $131,889 | 10,215 | kW-months/year | $12.91 |
Electricity Fees | $(-10,402) | - | $ | - |
Natural Gas | $142,459 | 28,332 | MMBtu | $5.03 |
TOTAL ENERGY COSTS | $491,530 | |||
RECOMMENDED SAVINGS* | $55,421 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $49,651 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $768 Cost: $28 |
$768 | 10,130 | - | - | - | - | - | - | - | - |
$768 10,130 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $2,920 Cost: $460 |
$712 | 9,384 | - | - | $2,208 | 439 | - | - | - | - |
$712 9,384 kWh |
- - kW-months/year |
$2,208 439 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,082 Cost: $379 |
$2,082 | 27,456 | - | - | - | - | - | - | - | - |
$2,082 27,456 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,002 Cost: $875 |
$666 | 8,786 | $336 | 26 | - | - | - | - | - | - |
$666 8,786 kWh |
$336 26 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT |
Savings: $27,937 Cost: $38,052 |
$22,654 | 298,716 | $5,283 | 409 | - | - | - | - | - | - |
$22,654 298,716 kWh |
$5,283 409 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1224 REPLACE BOILER |
Savings: $20,712 Cost: $66,681 |
- | - | - | - | $3,712 | 738 | $3,000 | - | $14,000 | - |
- - kWh |
- - kW-months/year |
$3,712 738 MMBtu |
$3,000 - $ |
$14,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $55,421 Cost: $106,475 |
$26,882 | 354,472 | $5,619 | 435 | $5,920 | 1,177 | $3,000 | - | $14,000 | - | $26,882 354,472 kWh |
$5,619 435 kW-months/year |
$5,920 1,177 MMBtu |
$3,000 - $ |
$14,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $49,651 Cost: $105,608 |
$23,320 | 307,502 | $5,619 | 435 | $3,712 | 738 | $3,000 | - | $14,000 | - | $23,320 307,502 kWh |
$5,619 435 kW-months/year |
$3,712 738 MMBtu |
$3,000 - $ |
$14,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |