Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Indiana University-Purdue University |
---|---|
Assessment Year | 2019 |
Principal Product | Cable assemblies and protective coatings |
NAICS | 332813 - Electroplating, Plating, Polishing, Anodizing, and Coloring |
SIC | 3471 - Plating And Polishing |
Sales | $1,000,000-$5,000,000 |
# of Employees | 18 |
Plant Area (Sq.Ft.) | 32,000 |
Annual Production | 700 Units |
Production Hrs. Annual | 2,080 |
Location (State) | IN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $23,170 | 292,609 | kWh | $0.08 |
Electricity Demand | $20,344 | 1,794 | kW-months/year | $11.34 |
Electricity Fees | $8,050 | - | $ | - |
LPG | $13,380 | 989 | MMBtu | $13.53 |
Other Gas | $8,000 | 250 | MMBtu | $32.00 |
TOTAL ENERGY COSTS | $88,214 | |||
RECOMMENDED SAVINGS* | $14,172 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $7,879 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | LPG | Electricity Usage | Electricity Demand | Electricity Fees | LPG | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $286 Cost: $7 |
$286 | 2,309 | - | - | - | - | - | - |
$286 2,309 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3512 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY |
Savings: $248 Cost: - |
$130 | 1,771 | $118 | 10 | - | - | - | - |
$130 1,771 kWh |
$118 10 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $442 Cost: $70 |
$442 | 6,046 | - | - | - | - | - | - |
$442 6,046 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $503 Cost: $100 |
$503 | 6,876 | - | - | - | - | - | - |
$503 6,876 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $1,980 Cost: $440 |
$601 | 4,860 | - | - | - | - | $1,379 | 102 |
$601 4,860 kWh |
- - kW-months/year |
- - $ |
$1,379 102 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $5,541 Cost: $9,685 |
- | - | - | - | $5,541 | - | - | - |
- - kWh |
- - kW-months/year |
$5,541 - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $96 Cost: $200 |
- | - | - | - | - | - | $96 | 7 |
- - kWh |
- - kW-months/year |
- - $ |
$96 7 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $758 Cost: $2,290 |
$758 | 6,126 | - | - | - | - | - | - |
$758 6,126 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,165 Cost: $13,663 |
$3,946 | 34,526 | $219 | 19 | - | - | - | - |
$3,946 34,526 kWh |
$219 19 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $153 Cost: $692 |
- | - | - | - | - | - | $153 | 11 |
- - kWh |
- - kW-months/year |
- - $ |
$153 11 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $14,172 Cost: $27,147 |
$6,666 | 62,514 | $337 | 29 | $5,541 | - | $1,628 | 120 | $6,666 62,514 kWh |
$337 29 kW-months/year |
$5,541 - $ |
$1,628 120 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $7,879 Cost: $16,470 |
$6,163 | 55,638 | $337 | 29 | - | - | $1,379 | 102 | $6,163 55,638 kWh |
$337 29 kW-months/year |
- - $ |
$1,379 102 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | LPG | Electricity Usage | Electricity Demand | Electricity Fees | LPG |