IAC Assessment: IP0151
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IP0151
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Indiana University-Purdue University
Assessment Year 2021
Principal Product steering components
NAICS 336330 - Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $100,000,000-$500,000,000
# of Employees 360
Plant Area (Sq.Ft.) 224,000
Annual Production 917,500 Pieces
Production Hrs. Annual 8,760
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $445,543 8,215,339 kWh $0.05
Electricity Demand $234,719 15,636 kW-months/year $15.01
Natural Gas $123,608 47,181 MMBtu $2.62
TOTAL ENERGY COSTS $803,870
RECOMMENDED SAVINGS* $56,801 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $56,801
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$759
Cost:
$18
$357 6,589 - - $402 157 $357
6,589
kWh
-
-
kW-months/year
$402
157
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,626
Cost:
$271
$6,423 118,510 $203 14 - - $6,423
118,510
kWh
$203
14
kW-months/year
-
-
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,159
Cost:
$767
$2,159 39,835 - - - - $2,159
39,835
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$20,612
Cost:
$34,884
$19,981 368,647 $632 42 - - $19,981
368,647
kWh
$632
42
kW-months/year
-
-
MMBtu
05: 2.1224 REPLACE BOILER Savings:
$26,645
Cost:
$57,558
- - - - $26,645 10,057 -
-
kWh
-
-
kW-months/year
$26,645
10,057
MMBtu
TOTAL RECOMMENDED Savings:
$56,801
Cost:
$93,498
$28,920 533,581 $835 56 $27,047 10,214 $28,920
533,581
kWh
$835
56
kW-months/year
$27,047
10,214
MMBtu
TOTAL IMPLEMENTED Savings:
$56,801
Cost:
$93,498
$28,920 533,581 $835 56 $27,047 10,214 $28,920
533,581
kWh
$835
56
kW-months/year
$27,047
10,214
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas