IAC logo
IAC Assessment: IP0171
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IP0171
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Indiana University-Purdue University
Assessment Year 2023
Principal Product Automotive Parts
NAICS 336390 - Other Motor Vehicle Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $100,000,000-$500,000,000
# of Employees 308
Plant Area (Sq.Ft.) 440,000
Annual Production 54,182,368 Units
Production Hrs. Annual 6,000
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $738,723 15,268,801 kWh $0.05
Electricity Demand $545,995 34,642 kW-months/year $15.76
Electricity Fees $30,258 - $ -
Natural Gas $214,375 71,539 MMBtu $3.00
TOTAL ENERGY COSTS $1,529,351
RECOMMENDED SAVINGS* $79,035 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$3,033
Cost:
-
$54 1,166 - - $2,979 993 $54
1,166
kWh
-
-
kW-months/year
$2,979
993
MMBtu
02: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$18,240
Cost:
-
- - $18,240 1,140 - - -
-
kWh
$18,240
1,140
kW-months/year
-
-
MMBtu
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$3,706
Cost:
$517
$3,706 80,568 - - - - $3,706
80,568
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.7212 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS Savings:
$261
Cost:
$38
$247 5,263 $15 1 - - $247
5,263
kWh
$15
1
kW-months/year
-
-
MMBtu
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$4,539
Cost:
$915
$2,677 58,200 $1,862 116 - - $2,677
58,200
kWh
$1,862
116
kW-months/year
-
-
MMBtu
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,171
Cost:
$1,316
$(-32) (-692) $(-24) (-2) $4,227 1,409 $(-32)
(-692)
kWh
$(-24)
(-2)
kW-months/year
$4,227
1,409
MMBtu
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$44,840
Cost:
$69,000
$44,840 974,782 - - - - $44,840
974,782
kWh
-
-
kW-months/year
-
-
MMBtu
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$117
Cost:
$499
$117 2,535 - - - - $117
2,535
kWh
-
-
kW-months/year
-
-
MMBtu
09: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$128
Cost:
$600
$128 2,787 - - - - $128
2,787
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$79,035
Cost:
$72,885
$51,736 1,124,609 $20,093 1,256 $7,206 2,402 $51,736
1,124,609
kWh
$20,093
1,256
kW-months/year
$7,206
2,402
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas