IAC logo
IAC Assessment: IP0208
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IP0208
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Indiana University-Purdue University
Assessment Year 2025
Principal Product Plastic Products
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 45
Plant Area (Sq.Ft.) 42,080
Annual Production 39,900,000 Units
Production Hrs. Annual 6,360
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $197,068 2,120,224 kWh $0.09
Electricity Demand $36,793 5,533 kW-months/year $6.65
Electricity Fees $23,245 - $ -
Natural Gas $2,851 234 MMBtu $12.18
TOTAL ENERGY COSTS $261,403
RECOMMENDED SAVINGS* $51,872 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$3,572
Cost:
-
$3,572 22,050 - - - - $3,572
22,050
kWh
-
-
kW-months/year
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,420
Cost:
$50
$1,878 21,096 $542 48 - - $1,878
21,096
kWh
$542
48
kW-months/year
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$524
Cost:
-
$431 5,429 $93 8 - - $431
5,429
kWh
$93
8
kW-months/year
-
-
$
04: 2.2691 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS Savings:
$1,666
Cost:
$82
$1,666 10,281 - - - - $1,666
10,281
kWh
-
-
kW-months/year
-
-
$
05: 2.7212 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS Savings:
$1,484
Cost:
$373
$1,484 9,158 - - - - $1,484
9,158
kWh
-
-
kW-months/year
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$705
Cost:
$200
$705 7,925 - - - - $705
7,925
kWh
-
-
kW-months/year
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$17,254
Cost:
$8,190
$15,243 94,090 $2,011 178 - - $15,243
94,090
kWh
$2,011
178
kW-months/year
-
-
$
08: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$23,307
Cost:
$34,470
- - - - $23,307 - -
-
kWh
-
-
kW-months/year
$23,307
-
$
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$940
Cost:
$1,742
$743 8,352 $197 17 - - $743
8,352
kWh
$197
17
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$51,872
Cost:
$45,107
$25,722 178,381 $2,843 252 $23,307 - $25,722
178,381
kWh
$2,843
252
kW-months/year
$23,307
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees