IAC logo
IAC Assessment: IP0213
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IP0213
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Indiana University-Purdue University
Assessment Year 2025
Principal Product Metal Plating
NAICS 332813 - Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471 - Plating And Polishing
Sales $5,000,000-$10,000,000
# of Employees 45
Plant Area (Sq.Ft.) 33,149
Annual Production 4,740,000 Pieces
Production Hrs. Annual 6,240
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $321,832 2,420,480 kWh $0.13
Natural Gas $175,610 20,736 MMBtu $8.47
TOTAL ENERGY COSTS $588,689
RECOMMENDED SAVINGS* $158,635 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,494
Cost:
-
$1,494 11,232 - - $1,494
11,232
kWh
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$15,623
Cost:
$640
$15,623 117,465 - - $15,623
117,465
kWh
-
-
MMBtu
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$10,374
Cost:
$270
$10,374 78,000 - - $10,374
78,000
kWh
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$40,943
Cost:
$4,528
$40,943 307,840 - - $40,943
307,840
kWh
-
-
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$953
Cost:
$280
$953 7,169 - - $953
7,169
kWh
-
-
MMBtu
06: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$9,346
Cost:
$3,710
$9,346 70,268 - - $9,346
70,268
kWh
-
-
MMBtu
07: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$825
Cost:
$340
$495 3,720 $330 39 $495
3,720
kWh
$330
39
MMBtu
08: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$48,428
Cost:
$56,200
- - $48,428 5,718 -
-
kWh
$48,428
5,718
MMBtu
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$23,151
Cost:
$26,250
$23,151 174,068 - - $23,151
174,068
kWh
-
-
MMBtu
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,498
Cost:
$13,433
$7,498 56,374 - - $7,498
56,374
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$158,635
Cost:
$105,651
$109,877 826,136 $48,758 5,757 $109,877
826,136
kWh
$48,758
5,757
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas