IAC Assessment: KG0046
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KG0046
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, Kingsville
Assessment Year 1996
Principal Product gaskets and fasteners
NAICS n/a
SIC 3053 - Gaskets, Packing And Sealing Devices
Sales $10,000,000-$50,000,000
# of Employees 77
Plant Area (Sq.Ft.) 23,650
Annual Production 0 Units
Production Hrs. Annual 4,030
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $23,648 710,434 kWh $0.03
Electricity Demand $28,474 2,047 kW-months/year $13.91
Electricity Fees $876 - $ -
Natural Gas $929 212 MMBtu $4.38
TOTAL ENERGY COSTS $53,927
RECOMMENDED SAVINGS* $24,319 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,152
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ gal $ lb
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$4,929
Cost:
$1,400
$2,044 63,013 $4,063 288 $(-1,178) (-54) - - - - $2,044
63,013
kWh
$4,063
288
kW-months/year
$(-1,178)
(-54)
MMBtu
-
-
gal
-
-
lb
02: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$4,874
Cost:
$700
$1,516 46,893 $4,232 300 $(-874) (-40) - - - - $1,516
46,893
kWh
$4,232
300
kW-months/year
$(-874)
(-40)
MMBtu
-
-
gal
-
-
lb
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,845
Cost:
$48
$1,845 6,448 - - - - - - - - $1,845
6,448
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,157
Cost:
$365
$429 13,189 $728 48 - - - - - - $429
13,189
kWh
$728
48
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$880
Cost:
$50
$383 11,723 $497 36 - - - - - - $383
11,723
kWh
$497
36
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$684
Cost:
$450
$684 21,102 - - - - - - - - $684
21,102
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$455
Cost:
$500
$455 14,068 - - - - - - - - $455
14,068
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$240
Cost:
$290
$240 7,327 - - - - - - - - $240
7,327
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
09: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$244
Cost:
$150
$244 7,620 - - - - - - - - $244
7,620
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
10: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$3,088
Cost:
$800
- - - - - - $3,088 40 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,088
40
gal
-
-
lb
11: 3.8121 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES Savings:
$2,130
Cost:
$300
- - - - - - $2,130 176 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,130
176
gal
-
-
lb
12: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$2,356
Cost:
-
- - - - - - - - $2,356 1,500 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$2,356
1,500
lb
13: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$1,437
Cost:
-
- - - - - - - - $1,437 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$1,437
-
lb
TOTAL RECOMMENDED Savings:
$24,319
Cost:
$5,053
$7,840 191,383 $9,520 672 $(-2,052) (-94) $5,218 216 $3,793 1,500 $7,840
191,383
kWh
$9,520
672
kW-months/year
$(-2,052)
(-94)
MMBtu
$5,218
216
gal
$3,793
1,500
lb
TOTAL IMPLEMENTED Savings:
$13,152
Cost:
$2,463
$3,413 54,807 $728 48 - - $5,218 216 $3,793 1,500 $3,413
54,807
kWh
$728
48
kW-months/year
-
-
MMBtu
$5,218
216
gal
$3,793
1,500
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz)