IAC Assessment: KG0087
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KG0087
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, Kingsville
Assessment Year 1997
Principal Product Flour based mixes
NAICS n/a
SIC 2041 - Flour And Other Grain Mill Products
Sales $100,000,000-$500,000,000
# of Employees 250
Plant Area (Sq.Ft.) 257,710
Annual Production 156,000,000 Pounds
Production Hrs. Annual 6,720
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $359,158 12,391,559 kWh $0.03
Electricity Demand $196,504 27,684 kW-months/year $7.10
Electricity Fees $13,560 - $ -
TOTAL ENERGY COSTS $4,216,325
RECOMMENDED SAVINGS* $3,522,869 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product
$ kWh $ kW-months/year $ lb $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,696
Cost:
$75
$1,875 64,771 $821 116 - - - - $1,875
64,771
kWh
$821
116
kW-months/year
-
-
lb
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,241
Cost:
$290
$1,561 53,927 $680 96 - - - - $1,561
53,927
kWh
$680
96
kW-months/year
-
-
lb
-
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,809
Cost:
$1,200
$1,809 62,427 - - - - - - $1,809
62,427
kWh
-
-
kW-months/year
-
-
lb
-
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,689
Cost:
$1,050
$1,689 58,324 - - - - - - $1,689
58,324
kWh
-
-
kW-months/year
-
-
lb
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$771
Cost:
$341
$516 17,878 $255 36 - - - - $516
17,878
kWh
$255
36
kW-months/year
-
-
lb
-
-
$
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$33,414
Cost:
-
- - - - $33,414 658,560 - - -
-
kWh
-
-
kW-months/year
$33,414
658,560
lb
-
-
$
07: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$11,385
Cost:
$360
- - - - $11,385 1,518,000 - - -
-
kWh
-
-
kW-months/year
$11,385
1,518,000
lb
-
-
$
08: 4.1120 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL Savings:
$2,822,400
Cost:
$686,200
- - - - - - $2,822,400 - -
-
kWh
-
-
kW-months/year
-
-
lb
$2,822,400
-
$
09: 4.1120 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL Savings:
$646,464
Cost:
-
- - - - - - $646,464 - -
-
kWh
-
-
kW-months/year
-
-
lb
$646,464
-
$
TOTAL RECOMMENDED Savings:
$3,522,869
Cost:
$689,516
$7,450 257,327 $1,756 248 $44,799 2,176,560 $3,468,864 - $7,450
257,327
kWh
$1,756
248
kW-months/year
$44,799
2,176,560
lb
$3,468,864
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product