IAC logo
IAC Assessment: KG0093
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KG0093
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, Kingsville
Assessment Year 1997
Principal Product Computer modems and multiplexers.
NAICS n/a
SIC 3661 - Telephone And Telegraph Apparatus
Sales $10,000,000-$50,000,000
# of Employees 96
Plant Area (Sq.Ft.) 50,000
Annual Production 41,000 Pieces
Production Hrs. Annual 2,250
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $53,980 1,215,123 kWh $0.04
Electricity Demand $14,613 3,623 kW-months/year $4.03
Electricity Fees $5,426 - $ -
TOTAL ENERGY COSTS $88,916
RECOMMENDED SAVINGS* $35,310 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$9,940
Cost:
-
$9,940 225,967 - - - - - - $9,940
225,967
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$15,398
Cost:
$1,708
$10,287 233,880 $1,723 445 $3,388 (-938) - - $10,287
233,880
kWh
$1,723
445
kW-months/year
$3,388
(-938)
MMBtu
-
-
lb
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$5,455
Cost:
-
$5,455 123,974 - - - - - - $5,455
123,974
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,105
Cost:
$1,102
$1,654 37,515 $451 116 - - - - $1,654
37,515
kWh
$451
116
kW-months/year
-
-
MMBtu
-
-
lb
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$1,692
Cost:
$65
- - - - - - $1,692 48,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,692
48,000
lb
06: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$720
Cost:
$22
- - - - - - $720 720 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$720
720
lb
TOTAL RECOMMENDED Savings:
$35,310
Cost:
$2,897
$27,336 621,336 $2,174 561 $3,388 (-938) $2,412 48,720 $27,336
621,336
kWh
$2,174
561
kW-months/year
$3,388
(-938)
MMBtu
$2,412
48,720
lb
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)