IAC logo
IAC Assessment: KG0094
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KG0094
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, Kingsville
Assessment Year 1997
Principal Product Printed pamphlets and fliers.
NAICS n/a
SIC 2741 - Miscellaneous Publishing
Sales $5,000,000-$10,000,000
# of Employees 78
Plant Area (Sq.Ft.) 42,000
Annual Production 30,600,000 Pieces
Production Hrs. Annual 7,344
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $40,084 1,138,628 kWh $0.04
Electricity Demand $21,195 3,569 kW-months/year $5.94
Electricity Fees $1,662 - $ -
Natural Gas $305 53 MMBtu $5.75
TOTAL ENERGY COSTS $105,233
RECOMMENDED SAVINGS* $84,254 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product
$ kWh $ kW-months/year $ lb $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,976
Cost:
$1,650
$2,976 86,753 - - - - - - $2,976
86,753
kWh
-
-
kW-months/year
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,348
Cost:
$660
$1,742 48,359 $606 100 - - - - $1,742
48,359
kWh
$606
100
kW-months/year
-
-
lb
-
-
$
03: 2.7292 LOWER CEILING TO REDUCE CONDITIONED SPACE Savings:
$1,251
Cost:
$1,200
$1,251 34,877 - - - - - - $1,251
34,877
kWh
-
-
kW-months/year
-
-
lb
-
-
$
04: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$7,246
Cost:
-
- - - - $7,246 - - - -
-
kWh
-
-
kW-months/year
$7,246
-
lb
-
-
$
05: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$1,239
Cost:
-
- - - - $1,239 8,862 - - -
-
kWh
-
-
kW-months/year
$1,239
8,862
lb
-
-
$
06: 4.1310 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$38,595
Cost:
$5,350
- - - - - - $38,595 - -
-
kWh
-
-
kW-months/year
-
-
lb
$38,595
-
$
07: 4.1310 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$30,599
Cost:
$4,600
- - - - - - $30,599 - -
-
kWh
-
-
kW-months/year
-
-
lb
$30,599
-
$
TOTAL RECOMMENDED Savings:
$84,254
Cost:
$13,460
$5,969 169,989 $606 100 $8,485 8,862 $69,194 - $5,969
169,989
kWh
$606
100
kW-months/year
$8,485
8,862
lb
$69,194
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product