Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Texas A&M, Kingsville |
---|---|
Assessment Year | 1997 |
Principal Product | Soft drink and juice dispensers |
NAICS | n/a |
SIC | 3685 - |
Sales | $50,000,000-$100,000,000 |
# of Employees | 475 |
Plant Area (Sq.Ft.) | 325,000 |
Annual Production | 4,500 Pieces |
Production Hrs. Annual | 6,600 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $194,561 | 6,161,782 | kWh | $0.03 |
Electricity Demand | $92,166 | 13,737 | kW-months/year | $6.71 |
Electricity Fees | $1,740 | - | $ | - |
Natural Gas | $6,143 | 1,427 | MMBtu | $4.30 |
TOTAL ENERGY COSTS | $511,652 | |||
RECOMMENDED SAVINGS* | $77,060 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Primary Product | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $5,748 Cost: - |
$5,748 | 183,177 | - | - | - | - | - | - |
$5,748 183,177 kWh |
- - kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,204 Cost: $1,620 |
$1,953 | 62,134 | $1,251 | 188 | - | - | - | - |
$1,953 62,134 kWh |
$1,251 188 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $2,094 Cost: $519 |
$2,094 | 66,530 | - | - | - | - | - | - |
$2,094 66,530 kWh |
- - kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $1,444 Cost: $4,133 |
$1,444 | 48,066 | - | - | - | - | - | - |
$1,444 48,066 kWh |
- - kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,325 Cost: $150 |
$949 | 30,188 | $376 | 56 | - | - | - | - |
$949 30,188 kWh |
$376 56 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2611 MODERATE COOLING TOWER OUTLET TEMPERATURE |
Savings: $870 Cost: $60 |
$870 | 27,550 | - | - | - | - | - | - |
$870 27,550 kWh |
- - kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $178 Cost: $352 |
$178 | 5,569 | - | - | - | - | - | - |
$178 5,569 kWh |
- - kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $270 Cost: $38 |
- | - | - | - | $270 | 12,000 | - | - |
- - kWh |
- - kW-months/year |
$270 12,000 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.423 MOVE PRODUCT USING MECHANICAL MEANS |
Savings: $22,327 Cost: $11,750 |
- | - | - | - | - | - | $22,327 | - |
- - kWh |
- - kW-months/year |
- - lb |
$22,327 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY |
Savings: $39,600 Cost: $6,000 |
- | - | - | - | - | - | $39,600 | - |
- - kWh |
- - kW-months/year |
- - lb |
$39,600 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $77,060 Cost: $24,622 |
$13,236 | 423,214 | $1,627 | 244 | $270 | 12,000 | $61,927 | - | $13,236 423,214 kWh |
$1,627 244 kW-months/year |
$270 12,000 lb |
$61,927 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Primary Product | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Primary Product |