IAC Assessment: KG0095
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KG0095
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, Kingsville
Assessment Year 1997
Principal Product Soft drink and juice dispensers
NAICS n/a
SIC 3685 -
Sales $50,000,000-$100,000,000
# of Employees 475
Plant Area (Sq.Ft.) 325,000
Annual Production 4,500 Pieces
Production Hrs. Annual 6,600
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $194,561 6,161,782 kWh $0.03
Electricity Demand $92,166 13,737 kW-months/year $6.71
Electricity Fees $1,740 - $ -
Natural Gas $6,143 1,427 MMBtu $4.30
TOTAL ENERGY COSTS $511,652
RECOMMENDED SAVINGS* $77,060 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product
$ kWh $ kW-months/year $ lb $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$5,748
Cost:
-
$5,748 183,177 - - - - - - $5,748
183,177
kWh
-
-
kW-months/year
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,204
Cost:
$1,620
$1,953 62,134 $1,251 188 - - - - $1,953
62,134
kWh
$1,251
188
kW-months/year
-
-
lb
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,094
Cost:
$519
$2,094 66,530 - - - - - - $2,094
66,530
kWh
-
-
kW-months/year
-
-
lb
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,444
Cost:
$4,133
$1,444 48,066 - - - - - - $1,444
48,066
kWh
-
-
kW-months/year
-
-
lb
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,325
Cost:
$150
$949 30,188 $376 56 - - - - $949
30,188
kWh
$376
56
kW-months/year
-
-
lb
-
-
$
06: 2.2611 MODERATE COOLING TOWER OUTLET TEMPERATURE Savings:
$870
Cost:
$60
$870 27,550 - - - - - - $870
27,550
kWh
-
-
kW-months/year
-
-
lb
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$178
Cost:
$352
$178 5,569 - - - - - - $178
5,569
kWh
-
-
kW-months/year
-
-
lb
-
-
$
08: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$270
Cost:
$38
- - - - $270 12,000 - - -
-
kWh
-
-
kW-months/year
$270
12,000
lb
-
-
$
09: 4.423 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$22,327
Cost:
$11,750
- - - - - - $22,327 - -
-
kWh
-
-
kW-months/year
-
-
lb
$22,327
-
$
10: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$39,600
Cost:
$6,000
- - - - - - $39,600 - -
-
kWh
-
-
kW-months/year
-
-
lb
$39,600
-
$
TOTAL RECOMMENDED Savings:
$77,060
Cost:
$24,622
$13,236 423,214 $1,627 244 $270 12,000 $61,927 - $13,236
423,214
kWh
$1,627
244
kW-months/year
$270
12,000
lb
$61,927
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product