IAC Assessment: KS2209
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KS2209
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Kennesaw State
Assessment Year 2022
Principal Product Appliance Metal Hardware
NAICS 332510 - Hardware Manufacturing
SIC 3499 - Fabricated Metal Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 326
Plant Area (Sq.Ft.) 180,000
Annual Production 18,000,000 Pieces
Production Hrs. Annual 5,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $512,825 5,125,355 kWh $0.10
Natural Gas $139,221 25,229 MMBtu $5.52
TOTAL ENERGY COSTS $686,114
RECOMMENDED SAVINGS* $209,940 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $110,725
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Natural Gas Administrative Changes One-time Revenue or Avoided Cost
$ kWh $ MMBtu $ $ $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$24,875
Cost:
$1,600
- - - - $6,219 - $18,656 - -
-
kWh
-
-
MMBtu
$6,219
-
$
$18,656
-
$
02: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$593
Cost:
-
- - - - $593 - - - -
-
kWh
-
-
MMBtu
$593
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$12,552
Cost:
$5,960
$12,552 125,515 - - - - - - $12,552
125,515
kWh
-
-
MMBtu
-
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,315
Cost:
$60
$4,315 43,146 - - - - - - $4,315
43,146
kWh
-
-
MMBtu
-
-
$
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,610
Cost:
$1,085
$2,610 26,100 - - - - - - $2,610
26,100
kWh
-
-
MMBtu
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,163
Cost:
$34,256
$5,600 56,000 - - $2,563 - - - $5,600
56,000
kWh
-
-
MMBtu
$2,563
-
$
-
-
$
07: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$77,094
Cost:
$526,518
$77,094 770,943 - - - - - - $77,094
770,943
kWh
-
-
MMBtu
-
-
$
-
-
$
08: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT Savings:
$79,738
Cost:
$627,000
$100,000 1,000,000 $(-13,862) (-2,512) $(-6,400) - - - $100,000
1,000,000
kWh
$(-13,862)
(-2,512)
MMBtu
$(-6,400)
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$209,940
Cost:
$1,196,479
$202,171 2,021,704 $(-13,862) (-2,512) $2,975 - $18,656 - $202,171
2,021,704
kWh
$(-13,862)
(-2,512)
MMBtu
$2,975
-
$
$18,656
-
$
TOTAL IMPLEMENTED Savings:
$110,725
Cost:
$562,374
$82,694 826,943 - - $9,375 - $18,656 - $82,694
826,943
kWh
-
-
MMBtu
$9,375
-
$
$18,656
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $
Electricity Usage Natural Gas Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Natural Gas Administrative Changes One-time Revenue or Avoided Cost