IAC Assessment: KS2311
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KS2311
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Kennesaw State
Assessment Year 2023
Principal Product Resilient Flooring
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3996 - Hard Surface Floor Coverings, Nec
Sales $50,000,000-$100,000,000
# of Employees 167
Plant Area (Sq.Ft.) 129,000
Annual Production 65,000,000 Units
Production Hrs. Annual 6,240
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,212,491 15,661,652 kWh $0.08
Natural Gas $675,170 55,159 MMBtu $12.24
TOTAL ENERGY COSTS $1,904,222
RECOMMENDED SAVINGS* $175,330 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,574
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Administrative Changes Electricity Usage Natural Gas Personnel Changes Administrative Changes
$ kWh $ MMBtu $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$12,574
Cost:
$6,440
$12,574 141,286 - - - - - - $12,574
141,286
kWh
-
-
MMBtu
-
-
$
-
-
$
02: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$19,596
Cost:
$10,708
- - $19,596 1,601 - - - - -
-
kWh
$19,596
1,601
MMBtu
-
-
$
-
-
$
03: 2.2123 INSULATE FEEDWATER TANK Savings:
$4,841
Cost:
$4,104
- - $4,841 396 - - - - -
-
kWh
$4,841
396
MMBtu
-
-
$
-
-
$
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$13,819
Cost:
$3,753
- - $13,819 1,129 - - - - -
-
kWh
$13,819
1,129
MMBtu
-
-
$
-
-
$
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,129
Cost:
-
- - $1,909 156 - - $(-780) - -
-
kWh
$1,909
156
MMBtu
-
-
$
$(-780)
-
$
06: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT Savings:
$66,324
Cost:
$627,000
$111,072 1,248,000 $(-38,348) (-3,133) $(-6,400) - - - $111,072
1,248,000
kWh
$(-38,348)
(-3,133)
MMBtu
$(-6,400)
-
$
-
-
$
07: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$57,047
Cost:
$422,421
$57,047 640,983 - - - - - - $57,047
640,983
kWh
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$175,330
Cost:
$1,074,426
$180,693 2,030,269 $1,817 149 $(-6,400) - $(-780) - $180,693
2,030,269
kWh
$1,817
149
MMBtu
$(-6,400)
-
$
$(-780)
-
$
TOTAL IMPLEMENTED Savings:
$12,574
Cost:
$6,440
$12,574 141,286 - - - - - - $12,574
141,286
kWh
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $
Electricity Usage Natural Gas Personnel Changes Administrative Changes Electricity Usage Natural Gas Personnel Changes Administrative Changes