Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Kennesaw State
Assessment Year 2023
Principal Product Plastic Parts of Vehicles
NAICS 336390 - Other Motor Vehicle Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $50,000,000-$100,000,000
# of Employees 130
Plant Area (Sq.Ft.) 276,000
Annual Production 398,000 Pieces
Production Hrs. Annual 6,240
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,063,518 11,614,598 kWh $0.09
Natural Gas $22,325 1,502 MMBtu $14.86
TOTAL ENERGY COSTS $1,110,014
RECOMMENDED SAVINGS* $148,880 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,991
Cost:
$5,960
$8,991 97,730 - - $8,991
97,730
kWh
-
-
$
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$33,086
Cost:
$235,752
$33,086 359,631 - - $33,086
359,631
kWh
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,175
Cost:
$24,588
$3,927 42,682 $1,248 - $3,927
42,682
kWh
$1,248
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,028
Cost:
$6,350
$3,387 36,816 $641 - $3,387
36,816
kWh
$641
-
$
05: 2.7212 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS Savings:
$545
Cost:
$1,958
$545 5,926 - - $545
5,926
kWh
-
-
$
06: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$39,181
Cost:
$254,691
$39,181 425,880 - - $39,181
425,880
kWh
-
-
$
07: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$57,874
Cost:
$421,464
$57,874 629,065 - - $57,874
629,065
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$148,880
Cost:
$950,763
$146,991 1,597,730 $1,889 - $146,991
1,597,730
kWh
$1,889
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
$
Savings
Cost
$ kWh $ $