IAC logo
IAC Assessment: KS2321
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KS2321
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Kennesaw State
Assessment Year 2023
Principal Product Chemical Manufacturing
NAICS 325180 - Other Basic Inorganic Chemical Manufacturing
SIC 2819 - Industrial Inorganic Chemicals, Nec
Sales $10,000,000-$50,000,000
# of Employees 38
Plant Area (Sq.Ft.) 74,000
Annual Production 660,000 Pounds
Production Hrs. Annual 8,400
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $80,048 2,097,375 kWh $0.04
Natural Gas $300,904 34,901 MMBtu $8.62
TOTAL ENERGY COSTS $448,003
RECOMMENDED SAVINGS* $261,738 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Usage Water Disposal Administrative Changes Electricity Usage Natural Gas Water Usage Water Disposal Administrative Changes
$ kWh $ MMBtu $ Tgal $ Tgal $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$89,035
Cost:
$701,322
$89,035 890,353 - - - - - - - - $89,035
890,353
kWh
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,032
Cost:
$5,480
$4,032 40,320 - - - - - - - - $4,032
40,320
kWh
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$646
Cost:
$1,328
$646 6,462 - - - - - - - - $646
6,462
kWh
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,362
Cost:
$3,175
$1,075 10,752 - - - - - - $287 - $1,075
10,752
kWh
-
-
MMBtu
-
-
Tgal
-
-
Tgal
$287
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,194
Cost:
$18,538
$3,410 34,104 - - - - - - $2,784 - $3,410
34,104
kWh
-
-
MMBtu
-
-
Tgal
-
-
Tgal
$2,784
-
$
06: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT Savings:
$125,249
Cost:
$627,000
$168,000 1,680,000 $(-36,351) (-4,217) - - - - $(-6,400) - $168,000
1,680,000
kWh
$(-36,351)
(-4,217)
MMBtu
-
-
Tgal
-
-
Tgal
$(-6,400)
-
$
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$5,241
Cost:
$1,770
- - $5,241 608 - - - - - - -
-
kWh
$5,241
608
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
08: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$29,979
Cost:
$30
- - $12,197 1,415 $7,686 968 $10,096 968 - - -
-
kWh
$12,197
1,415
MMBtu
$7,686
968
Tgal
$10,096
968
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$261,738
Cost:
$1,358,643
$266,198 2,661,991 $(-18,913) (-2,194) $7,686 968 $10,096 968 $(-3,329) - $266,198
2,661,991
kWh
$(-18,913)
(-2,194)
MMBtu
$7,686
968
Tgal
$10,096
968
Tgal
$(-3,329)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ MMBtu $ Tgal $ Tgal $ $
Electricity Usage Natural Gas Water Usage Water Disposal Administrative Changes Electricity Usage Natural Gas Water Usage Water Disposal Administrative Changes