IAC logo
IAC Assessment: KS2324
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KS2324
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Kennesaw State
Assessment Year 2023
Principal Product Salad Toppings
NAICS 311999 - All Other Miscellaneous Food Manufacturing
SIC 2099 - Food Preparations, Nec
Sales $100,000,000-$500,000,000
# of Employees 450
Plant Area (Sq.Ft.) 606,000
Annual Production 50,000,000 Pounds
Production Hrs. Annual 7,488
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,181,339 16,146,133 kWh $0.07
Natural Gas $507,438 73,921 MMBtu $6.86
TOTAL ENERGY COSTS $1,714,818
RECOMMENDED SAVINGS* $182,517 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$63,860
Cost:
$598,739
$63,860 874,793 - - - - $63,860
874,793
kWh
-
-
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,738
Cost:
$5,480
$7,738 105,996 - - - - $7,738
105,996
kWh
-
-
MMBtu
-
-
$
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$32,201
Cost:
-
$32,201 441,110 - - - - $32,201
441,110
kWh
-
-
MMBtu
-
-
$
04: 2.1135 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY Savings:
$12,787
Cost:
$8,320
- - $12,787 1,864 - - -
-
kWh
$12,787
1,864
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,344
Cost:
$22,467
$3,306 45,287 - - $3,038 - $3,306
45,287
kWh
-
-
MMBtu
$3,038
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,028
Cost:
$4,064
$1,548 21,206 - - $480 - $1,548
21,206
kWh
-
-
MMBtu
$480
-
$
07: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$57,559
Cost:
$312,824
$57,559 788,486 - - - - $57,559
788,486
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$182,517
Cost:
$951,894
$166,212 2,276,878 $12,787 1,864 $3,518 - $166,212
2,276,878
kWh
$12,787
1,864
MMBtu
$3,518
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes