IAC logo
IAC Assessment: KS2429
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KS2429
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Kennesaw State
Assessment Year 2024
Principal Product Metal Components Parts
NAICS 332312 - Fabricated Structural Metal Manufacturing
SIC 3441 - Fabricated Structural Metal
Sales $10,000,000-$50,000,000
# of Employees 81
Plant Area (Sq.Ft.) 103,000
Annual Production 2,000,000 Pieces
Production Hrs. Annual 5,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $182,754 1,660,320 kWh $0.11
Natural Gas $52,677 26,779 MMBtu $1.97
TOTAL ENERGY COSTS $237,362
RECOMMENDED SAVINGS* $94,247 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$57,379
Cost:
$484,288
$57,379 521,623 - - $57,379
521,623
kWh
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,105
Cost:
$5,480
$6,105 55,500 - - $6,105
55,500
kWh
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,838
Cost:
$90
$1,838 16,708 - - $1,838
16,708
kWh
-
-
$
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$12,730
Cost:
$126,398
$12,730 115,731 - - $12,730
115,731
kWh
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,984
Cost:
$26,926
$8,166 74,240 $1,818 - $8,166
74,240
kWh
$1,818
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$6,211
Cost:
$6,604
$5,720 52,000 $491 - $5,720
52,000
kWh
$491
-
$
TOTAL RECOMMENDED Savings:
$94,247
Cost:
$649,786
$91,938 835,802 $2,309 - $91,938
835,802
kWh
$2,309
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes