IAC logo
IAC Assessment: KS2430
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KS2430
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Kennesaw State
Assessment Year 2024
Principal Product Corrugated Board
NAICS 322211 - Corrugated and Solid Fiber Box Manufacturing
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 153
Plant Area (Sq.Ft.) 185,000
Annual Production 646,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $412,194 6,713,853 kWh $0.06
Electricity Demand $202,001 13,214 kW-months/year $15.29
Natural Gas $277,478 66,418 MMBtu $4.18
TOTAL ENERGY COSTS $939,917
RECOMMENDED SAVINGS* $173,359 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$53,570
Cost:
$460,976
$40,437 662,902 $13,133 859 - - - - $40,437
662,902
kWh
$13,133
859
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,137
Cost:
$60
$1,739 28,514 $1,398 91 - - - - $1,739
28,514
kWh
$1,398
91
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,174
Cost:
$9,216
$767 12,580 $370 24 - - $1,037 - $767
12,580
kWh
$370
24
kW-months/year
-
-
MMBtu
$1,037
-
$
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$4,172
Cost:
$5,121
- - - - $4,172 998 - - -
-
kWh
-
-
kW-months/year
$4,172
998
MMBtu
-
-
$
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$16,954
Cost:
$60,601
- - - - $16,954 4,056 - - -
-
kWh
-
-
kW-months/year
$16,954
4,056
MMBtu
-
-
$
06: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT Savings:
$93,352
Cost:
$684,000
$76,128 1,248,000 $36,720 2,400 $(-13,096) (-3,133) $(-6,400) - $76,128
1,248,000
kWh
$36,720
2,400
kW-months/year
$(-13,096)
(-3,133)
MMBtu
$(-6,400)
-
$
TOTAL RECOMMENDED Savings:
$173,359
Cost:
$1,219,974
$119,071 1,951,996 $51,621 3,375 $8,030 1,921 $(-5,363) - $119,071
1,951,996
kWh
$51,621
3,375
kW-months/year
$8,030
1,921
MMBtu
$(-5,363)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $