IAC Assessment: KU0032
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1982
Principal Product MOLDED PLASTIC PARTS
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 60
Plant Area (Sq.Ft.) 0
Annual Production 2,000,000 Pounds
Production Hrs. Annual 6,312
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $107,633 1,956,038 kWh $0.06
Natural Gas $4,064 1,508 MMBtu $2.69
TOTAL ENERGY COSTS $111,697
RECOMMENDED SAVINGS* $50,857 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$14,570
Cost:
-
$14,570 264,947 - - $14,570
264,947
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,434
Cost:
-
$2,434 44,256 - - $2,434
44,256
kWh
-
-
MMBtu
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,756
Cost:
$475
$3,756 68,288 - - $3,756
68,288
kWh
-
-
MMBtu
04: 2.7494 INSTALL STORM WINDOWS AND DOORS Savings:
$1,984
Cost:
$568
- - $1,984 769 -
-
kWh
$1,984
769
MMBtu
05: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$28,113
Cost:
$40,000
$28,113 511,137 - - $28,113
511,137
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$50,857
Cost:
$41,043
$48,873 888,628 $1,984 769 $48,873
888,628
kWh
$1,984
769
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas