IAC logo
IAC Assessment: KU0048
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0048
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1982
Principal Product SNACK FOODS
NAICS n/a
SIC 2099 - Food Preparations, Nec
Sales $50,000,000-$100,000,000
# of Employees 425
Plant Area (Sq.Ft.) 0
Annual Production 40,000,000 Pounds
Production Hrs. Annual 6,696
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $331,523 9,238,570 kWh $0.04
Natural Gas $489,904 193,093 MMBtu $2.54
TOTAL ENERGY COSTS $821,427
RECOMMENDED SAVINGS* $92,458 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $74,678
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$29,754
Cost:
$15,000
$29,754 829,719 - - $29,754
829,719
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$18,256
Cost:
$5,941
$18,256 509,086 - - $18,256
509,086
kWh
-
-
MMBtu
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$8,484
Cost:
$21,600
- - $8,484 3,340 -
-
kWh
$8,484
3,340
MMBtu
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$13,580
Cost:
$1,400
- - $13,580 5,347 -
-
kWh
$13,580
5,347
MMBtu
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$13,088
Cost:
$13,000
- - $13,088 5,153 -
-
kWh
$13,088
5,153
MMBtu
06: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$9,296
Cost:
$1,500
- - $9,296 3,660 -
-
kWh
$9,296
3,660
MMBtu
TOTAL RECOMMENDED Savings:
$92,458
Cost:
$58,441
$48,010 1,338,805 $44,448 17,500 $48,010
1,338,805
kWh
$44,448
17,500
MMBtu
TOTAL IMPLEMENTED Savings:
$74,678
Cost:
$35,341
$48,010 1,338,805 $26,668 10,500 $48,010
1,338,805
kWh
$26,668
10,500
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas