IAC logo
IAC Assessment: KU0093
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0093
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1983
Principal Product TOOLS FOR CONCRETE
NAICS n/a
SIC 3423 - Hand And Edge Tools, Nec
Sales $10,000,000-$50,000,000
# of Employees 151
Plant Area (Sq.Ft.) 0
Annual Production 7,000,000 Pounds
Production Hrs. Annual 4,175
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $162,230 2,307,444 kWh $0.07
Natural Gas $45,164 8,375 MMBtu $5.39
TOTAL ENERGY COSTS $207,394
RECOMMENDED SAVINGS* $56,649 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,806
#|Description Savings
Cost
Status Electricity Usage Natural Gas Paper Electricity Usage Natural Gas Paper
$ kWh $ MMBtu $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15,313
Cost:
$35,000
$15,313 217,761 - - - - $15,313
217,761
kWh
-
-
MMBtu
-
-
MMBtu
02: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$7,691
Cost:
$300
- - $7,691 1,427 - - -
-
kWh
$7,691
1,427
MMBtu
-
-
MMBtu
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$5,773
Cost:
$3,300
- - $5,773 1,071 - - -
-
kWh
$5,773
1,071
MMBtu
-
-
MMBtu
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$140
Cost:
$500
$140 2,052 - - - - $140
2,052
kWh
-
-
MMBtu
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,642
Cost:
$750
$2,642 37,515 - - - - $2,642
37,515
kWh
-
-
MMBtu
-
-
MMBtu
06: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$442
Cost:
$300
- - $442 82 - - -
-
kWh
$442
82
MMBtu
-
-
MMBtu
07: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$3,591
Cost:
$4,600
- - $3,591 666 - - -
-
kWh
$3,591
666
MMBtu
-
-
MMBtu
08: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$4,043
Cost:
$1,440
- - $4,043 750 - - -
-
kWh
$4,043
750
MMBtu
-
-
MMBtu
09: 3.6121 BURN WASTE PAPER FOR HEAT Savings:
$16,658
Cost:
$58,000
- - $21,140 3,922 $(-4,482) (-4,482) -
-
kWh
$21,140
3,922
MMBtu
$(-4,482)
(-4,482)
MMBtu
10: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$356
Cost:
-
- - $356 66 - - -
-
kWh
$356
66
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$56,649
Cost:
$104,190
$18,095 257,328 $43,036 7,984 $(-4,482) (-4,482) $18,095
257,328
kWh
$43,036
7,984
MMBtu
$(-4,482)
(-4,482)
MMBtu
TOTAL IMPLEMENTED Savings:
$9,806
Cost:
$8,200
- - $9,806 1,819 - - -
-
kWh
$9,806
1,819
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Natural Gas Paper Electricity Usage Natural Gas Paper