Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Univ. of Kansas |
---|---|
Assessment Year | 1983 |
Principal Product | TOOLS FOR CONCRETE |
NAICS | n/a |
SIC | 3423 - Hand And Edge Tools, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 151 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 7,000,000 Pounds |
Production Hrs. Annual | 4,175 |
Location (State) | KS |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $162,230 | 2,307,444 | kWh | $0.07 |
Natural Gas | $45,164 | 8,375 | MMBtu | $5.39 |
TOTAL ENERGY COSTS | $207,394 | |||
RECOMMENDED SAVINGS* | $56,649 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $9,806 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Paper | Electricity Usage | Natural Gas | Paper | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $15,313 Cost: $35,000 |
$15,313 | 217,761 | - | - | - | - |
$15,313 217,761 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS |
Savings: $7,691 Cost: $300 |
- | - | $7,691 | 1,427 | - | - |
- - kWh |
$7,691 1,427 MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $5,773 Cost: $3,300 |
- | - | $5,773 | 1,071 | - | - |
- - kWh |
$5,773 1,071 MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $140 Cost: $500 |
$140 | 2,052 | - | - | - | - |
$140 2,052 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,642 Cost: $750 |
$2,642 | 37,515 | - | - | - | - |
$2,642 37,515 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1123 INSTALL AUTOMATIC STACK DAMPER |
Savings: $442 Cost: $300 |
- | - | $442 | 82 | - | - |
- - kWh |
$442 82 MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.1123 INSTALL AUTOMATIC STACK DAMPER |
Savings: $3,591 Cost: $4,600 |
- | - | $3,591 | 666 | - | - |
- - kWh |
$3,591 666 MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS |
Savings: $4,043 Cost: $1,440 |
- | - | $4,043 | 750 | - | - |
- - kWh |
$4,043 750 MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.6121 BURN WASTE PAPER FOR HEAT |
Savings: $16,658 Cost: $58,000 |
- | - | $21,140 | 3,922 | $(-4,482) | (-4,482) |
- - kWh |
$21,140 3,922 MMBtu |
$(-4,482) (-4,482) MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED |
Savings: $356 Cost: - |
- | - | $356 | 66 | - | - |
- - kWh |
$356 66 MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $56,649 Cost: $104,190 |
$18,095 | 257,328 | $43,036 | 7,984 | $(-4,482) | (-4,482) | $18,095 257,328 kWh |
$43,036 7,984 MMBtu |
$(-4,482) (-4,482) MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $9,806 Cost: $8,200 |
- | - | $9,806 | 1,819 | - | - | - - kWh |
$9,806 1,819 MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Paper | Electricity Usage | Natural Gas | Paper |