IAC logo
IAC Assessment: KU0097
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0097
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1983
Principal Product FLUORESCENT LIGHT FIXTURES
NAICS n/a
SIC 3645 - Residential Lighting Fixtures
Sales $5,000,000-$10,000,000
# of Employees 130
Plant Area (Sq.Ft.) 0
Annual Production 450,000 Pieces
Production Hrs. Annual 4,572
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $53,764 715,123 kWh $0.08
Natural Gas $46,392 9,495 MMBtu $4.89
TOTAL ENERGY COSTS $100,156
RECOMMENDED SAVINGS* $41,881 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,017
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$12,636
Cost:
$13,000
- - $12,636 2,584 -
-
kWh
$12,636
2,584
MMBtu
02: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$10,812
Cost:
$8,500
- - $10,812 2,211 -
-
kWh
$10,812
2,211
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,389
Cost:
$4,629
$6,389 84,994 - - $6,389
84,994
kWh
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,608
Cost:
$132
$3,608 48,066 - - $3,608
48,066
kWh
-
-
MMBtu
05: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$2,533
Cost:
$2,500
$2,533 33,705 - - $2,533
33,705
kWh
-
-
MMBtu
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,494
Cost:
$2,800
$1,494 - - - $1,494
-
kWh
-
-
MMBtu
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$727
Cost:
$200
$727 9,672 - - $727
9,672
kWh
-
-
MMBtu
08: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,237
Cost:
$410
- - $1,237 253 -
-
kWh
$1,237
253
MMBtu
09: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$1,110
Cost:
$2,589
- - $1,110 227 -
-
kWh
$1,110
227
MMBtu
10: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$983
Cost:
$192
- - $983 201 -
-
kWh
$983
201
MMBtu
11: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$352
Cost:
$100
$352 4,689 - - $352
4,689
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$41,881
Cost:
$35,052
$15,103 181,126 $26,778 5,476 $15,103
181,126
kWh
$26,778
5,476
MMBtu
TOTAL IMPLEMENTED Savings:
$8,017
Cost:
$3,623
$4,687 62,427 $3,330 681 $4,687
62,427
kWh
$3,330
681
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas