IAC logo
IAC Assessment: KU0108
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0108
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1983
Principal Product LEAD ACID BATTERIES
NAICS n/a
SIC 3691 - Storage Batteries
Sales $5,000,000-$10,000,000
# of Employees 60
Plant Area (Sq.Ft.) 0
Annual Production 60,000 Pieces
Production Hrs. Annual 8,400
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $149,771 2,296,307 kWh $0.07
Natural Gas $65,242 12,689 MMBtu $5.14
TOTAL ENERGY COSTS $215,013
RECOMMENDED SAVINGS* $18,432 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,912
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$760
Cost:
$400
- - $760 148 -
-
kWh
$760
148
MMBtu
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$6,604
Cost:
$16,000
$6,604 - - - $6,604
-
kWh
-
-
MMBtu
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$4,071
Cost:
$300
- - $4,071 792 -
-
kWh
$4,071
792
MMBtu
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,414
Cost:
$400
- - $1,414 275 -
-
kWh
$1,414
275
MMBtu
05: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$872
Cost:
$132
$229 3,517 $643 125 $229
3,517
kWh
$643
125
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,351
Cost:
$6,314
$2,351 36,049 - - $2,351
36,049
kWh
-
-
MMBtu
07: 2.7441 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH Savings:
$1,840
Cost:
$52
- - $1,840 358 -
-
kWh
$1,840
358
MMBtu
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$191
Cost:
-
$191 2,931 - - $191
2,931
kWh
-
-
MMBtu
09: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$329
Cost:
-
- - $329 64 -
-
kWh
$329
64
MMBtu
TOTAL RECOMMENDED Savings:
$18,432
Cost:
$23,598
$9,375 42,497 $9,057 1,762 $9,375
42,497
kWh
$9,057
1,762
MMBtu
TOTAL IMPLEMENTED Savings:
$17,912
Cost:
$23,598
$9,184 39,566 $8,728 1,698 $9,184
39,566
kWh
$8,728
1,698
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas