IAC logo
IAC Assessment: KU0110
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0110
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1983
Principal Product STEEL FASTENERS
NAICS n/a
SIC 3452 - Bolts, Nuts, Rivets, And Washers
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 0
Annual Production 2,200,000 Pounds
Production Hrs. Annual 2,385
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $24,549 355,510 kWh $0.07
Natural Gas $13,105 2,423 MMBtu $5.41
TOTAL ENERGY COSTS $37,654
RECOMMENDED SAVINGS* $6,177 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,083
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,125
Cost:
$300
- - $1,125 208 -
-
kWh
$1,125
208
MMBtu
02: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$1,012
Cost:
$800
- - $1,012 187 -
-
kWh
$1,012
187
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,606
Cost:
$4,200
$2,606 37,808 - - $2,606
37,808
kWh
-
-
MMBtu
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$465
Cost:
$3,000
- - $465 86 -
-
kWh
$465
86
MMBtu
05: 2.6214 SHUT OFF PILOTS IN STANDBY EQUIPMENT Savings:
$200
Cost:
-
- - $200 37 -
-
kWh
$200
37
MMBtu
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$445
Cost:
$200
$445 6,448 - - $445
6,448
kWh
-
-
MMBtu
07: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$162
Cost:
-
- - $162 8 -
-
kWh
$162
8
MMBtu
08: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$162
Cost:
-
$162 2,345 - - $162
2,345
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$6,177
Cost:
$8,500
$3,213 46,601 $2,964 526 $3,213
46,601
kWh
$2,964
526
MMBtu
TOTAL IMPLEMENTED Savings:
$4,083
Cost:
$8,000
$2,606 37,808 $1,477 273 $2,606
37,808
kWh
$1,477
273
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas