IAC Assessment: KU0112
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0112
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1984
Principal Product MOUNTED CRANES
NAICS n/a
SIC 3531 - Construction Machinery
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 0
Annual Production 2,500 Pieces
Production Hrs. Annual 5,000
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $87,009 1,541,618 kWh $0.06
Natural Gas $39,611 7,582 MMBtu $5.22
TOTAL ENERGY COSTS $126,620
RECOMMENDED SAVINGS* $37,920 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,079
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$18,588
Cost:
$1,074
- - $18,588 3,561 - - -
-
kWh
$18,588
3,561
MMBtu
-
-
$
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$3,459
Cost:
-
$463 8,206 $2,996 574 - - $463
8,206
kWh
$2,996
574
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,757
Cost:
$12,786
$7,757 137,456 - - - - $7,757
137,456
kWh
-
-
MMBtu
-
-
$
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$795
Cost:
$200
- - $1,195 229 $(-400) - -
-
kWh
$1,195
229
MMBtu
$(-400)
-
$
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$398
Cost:
$400
- - $548 105 $(-150) - -
-
kWh
$548
105
MMBtu
$(-150)
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,012
Cost:
$2,800
$5,012 88,804 - - - - $5,012
88,804
kWh
-
-
MMBtu
-
-
$
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,000
Cost:
$360
$1,000 17,878 - - - - $1,000
17,878
kWh
-
-
MMBtu
-
-
$
08: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$286
Cost:
-
- - $286 55 - - -
-
kWh
$286
55
MMBtu
-
-
$
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$625
Cost:
$300
$625 11,137 - - - - $625
11,137
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$37,920
Cost:
$17,920
$14,857 263,481 $23,613 4,524 $(-550) - $14,857
263,481
kWh
$23,613
4,524
MMBtu
$(-550)
-
$
TOTAL IMPLEMENTED Savings:
$25,079
Cost:
$4,474
$5,012 88,804 $20,617 3,950 $(-550) - $5,012
88,804
kWh
$20,617
3,950
MMBtu
$(-550)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes