IAC logo
IAC Assessment: KU0120
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0120
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1984
Principal Product CONVERTER OF PVC FILM
NAICS n/a
SIC 2759 - Commercial Printing, Nec
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 0
Annual Production 4,000,000 Pounds
Production Hrs. Annual 4,000
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $50,720 744,725 kWh $0.07
Natural Gas $8,019 1,637 MMBtu $4.90
TOTAL ENERGY COSTS $58,739
RECOMMENDED SAVINGS* $10,483 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,515
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,272
Cost:
$2,159
$3,272 48,066 - - - - $3,272
48,066
kWh
-
-
MMBtu
-
-
$
02: 2.2532 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD Savings:
$2,048
Cost:
$200
- - $2,048 418 - - -
-
kWh
$2,048
418
MMBtu
-
-
$
03: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$1,536
Cost:
$215
$1,536 22,567 - - - - $1,536
22,567
kWh
-
-
MMBtu
-
-
$
04: 2.7211 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS Savings:
$917
Cost:
-
$1,117 16,413 - - $(-200) - $1,117
16,413
kWh
-
-
MMBtu
$(-200)
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,077
Cost:
$70
$1,077 15,826 - - - - $1,077
15,826
kWh
-
-
MMBtu
-
-
$
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$519
Cost:
$240
$519 7,620 - - - - $519
7,620
kWh
-
-
MMBtu
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$479
Cost:
-
$479 7,034 - - - - $479
7,034
kWh
-
-
MMBtu
-
-
$
08: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$249
Cost:
-
$419 6,155 - - $(-170) - $419
6,155
kWh
-
-
MMBtu
$(-170)
-
$
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$259
Cost:
$358
$259 3,810 - - - - $259
3,810
kWh
-
-
MMBtu
-
-
$
10: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$127
Cost:
-
- - $127 26 - - -
-
kWh
$127
26
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$10,483
Cost:
$3,242
$8,678 127,491 $2,175 444 $(-370) - $8,678
127,491
kWh
$2,175
444
MMBtu
$(-370)
-
$
TOTAL IMPLEMENTED Savings:
$5,515
Cost:
$2,229
$5,885 86,460 - - $(-370) - $5,885
86,460
kWh
-
-
MMBtu
$(-370)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes