Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Univ. of Kansas |
---|---|
Assessment Year | 1984 |
Principal Product | CEREALS |
NAICS | n/a |
SIC | 2041 - Flour And Other Grain Mill Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 96 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 8,000,000 Bushels |
Production Hrs. Annual | 7,800 |
Location (State) | KS |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $842,586 | 17,917,058 | kWh | $0.05 |
Natural Gas | $510,956 | 145,330 | MMBtu | $3.52 |
TOTAL ENERGY COSTS | $1,353,542 | |||
RECOMMENDED SAVINGS* | $154,926 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $137,694 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $47,344 Cost: $2,000 |
$47,344 | - | - | - | - | - |
$47,344 - kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $36,100 Cost: $1,000 |
$36,100 | 768,171 | - | - | - | - |
$36,100 768,171 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $24,518 Cost: $20,000 |
$24,518 | - | - | - | - | - |
$24,518 - kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $18,864 Cost: $28,500 |
$18,864 | - | - | - | - | - |
$18,864 - kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $8,943 Cost: $5,443 |
$8,943 | 191,090 | - | - | - | - |
$8,943 191,090 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $8,298 Cost: - |
- | - | $8,698 | 2,471 | $(-400) | - |
- - kWh |
$8,698 2,471 MMBtu |
$(-400) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,894 Cost: $1,350 |
$2,894 | 61,547 | - | - | - | - |
$2,894 61,547 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,750 Cost: $20 |
$1,750 | 37,222 | - | - | - | - |
$1,750 37,222 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE |
Savings: $3,645 Cost: - |
- | - | $3,645 | 1,035 | - | - |
- - kWh |
$3,645 1,035 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,267 Cost: $1,700 |
- | - | $1,267 | 360 | - | - |
- - kWh |
$1,267 360 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $1,116 Cost: $300 |
$1,116 | 23,740 | - | - | - | - |
$1,116 23,740 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $187 Cost: $60 |
- | - | $187 | 53 | - | - |
- - kWh |
$187 53 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $154,926 Cost: $60,373 |
$141,529 | 1,081,770 | $13,797 | 3,919 | $(-400) | - | $141,529 1,081,770 kWh |
$13,797 3,919 MMBtu |
$(-400) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $137,694 Cost: $53,560 |
$127,942 | 791,911 | $10,152 | 2,884 | $(-400) | - | $127,942 791,911 kWh |
$10,152 2,884 MMBtu |
$(-400) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes |