IAC logo
IAC Assessment: KU0144
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0144
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1984
Principal Product AIR CONDITIONING EQUIPMENT
NAICS n/a
SIC 3564 - Blowers And Fans
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 0
Annual Production 100,000 Pieces
Production Hrs. Annual 2,082
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $106,293 1,558,910 kWh $0.07
Natural Gas $38,123 9,011 MMBtu $4.23
TOTAL ENERGY COSTS $144,416
RECOMMENDED SAVINGS* $23,327 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,801
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7314 REDUCE VENTILATION AIR Savings:
$11,229
Cost:
-
$3,137 46,014 $8,092 1,913 - - $3,137
46,014
kWh
$8,092
1,913
MMBtu
-
-
$
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$3,395
Cost:
$4,000
$3,395 - - - - - $3,395
-
kWh
-
-
MMBtu
-
-
$
03: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$1,597
Cost:
-
$3,097 45,428 - - $(-1,500) - $3,097
45,428
kWh
-
-
MMBtu
$(-1,500)
-
$
04: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$2,157
Cost:
$1,900
- - $2,157 510 - - -
-
kWh
$2,157
510
MMBtu
-
-
$
05: 2.7211 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS Savings:
$1,578
Cost:
-
$2,078 30,481 - - $(-500) - $2,078
30,481
kWh
-
-
MMBtu
$(-500)
-
$
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,279
Cost:
$39
$40 586 $1,239 293 - - $40
586
kWh
$1,239
293
MMBtu
-
-
$
08: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$160
Cost:
-
- - $660 156 $(-500) - -
-
kWh
$660
156
MMBtu
$(-500)
-
$
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,039
Cost:
$500
$1,039 15,240 - - - - $1,039
15,240
kWh
-
-
MMBtu
-
-
$
10: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$753
Cost:
$400
$440 6,448 $313 74 - - $440
6,448
kWh
$313
74
MMBtu
-
-
$
11: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$140
Cost:
$200
$140 2,052 - - - - $140
2,052
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$23,327
Cost:
$7,039
$13,366 146,249 $12,461 2,946 $(-2,500) - $13,366
146,249
kWh
$12,461
2,946
MMBtu
$(-2,500)
-
$
TOTAL IMPLEMENTED Savings:
$9,801
Cost:
$4,939
$10,089 98,183 $2,212 523 $(-2,500) - $10,089
98,183
kWh
$2,212
523
MMBtu
$(-2,500)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes