IAC Assessment: KU0154
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0154
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1985
Principal Product CEREAL ANIMAL FOOD
NAICS n/a
SIC 2048 - Prepared Feeds, Nec
Sales $5,000,000-$10,000,000
# of Employees 20
Plant Area (Sq.Ft.) 0
Annual Production 60,000 Tons
Production Hrs. Annual 4,400
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $69,804 858,148 kWh $0.08
Natural Gas $17,248 3,831 MMBtu $4.50
Other Energy $9,428 1,217 MMBtu $7.75
TOTAL ENERGY COSTS $96,480
RECOMMENDED SAVINGS* $45,036 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,635
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Energy Administrative Changes Electricity Usage Natural Gas Other Energy Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$18,860
Cost:
-
$21,590 265,533 - - - - $(-2,730) - $21,590
265,533
kWh
-
-
MMBtu
-
-
MMBtu
$(-2,730)
-
$
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$7,380
Cost:
$3,000
$7,380 - - - - - - - $7,380
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
03: 2.6232 INSTALL SET-BACK TIMERS Savings:
$4,194
Cost:
$1,052
$4,194 51,583 - - - - - - $4,194
51,583
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,813
Cost:
$500
$3,813 46,893 - - - - - - $3,813
46,893
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
05: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$3,686
Cost:
$2,700
- - $3,686 819 - - - - -
-
kWh
$3,686
819
MMBtu
-
-
MMBtu
-
-
$
06: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$1,854
Cost:
$700
- - $1,854 412 - - - - -
-
kWh
$1,854
412
MMBtu
-
-
MMBtu
-
-
$
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$974
Cost:
-
- - $1,274 283 - - $(-300) - -
-
kWh
$1,274
283
MMBtu
-
-
MMBtu
$(-300)
-
$
08: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,887
Cost:
$1,200
$1,883 23,154 $1,004 223 - - - - $1,883
23,154
kWh
$1,004
223
MMBtu
-
-
MMBtu
-
-
$
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$739
Cost:
$100
$739 9,086 - - - - - - $739
9,086
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$262
Cost:
$20
$262 3,224 - - - - - - $262
3,224
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
11: 2.8223 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE Savings:
$279
Cost:
-
- - - - $279 36 - - -
-
kWh
-
-
MMBtu
$279
36
MMBtu
-
-
$
12: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$108
Cost:
$50
- - $108 24 - - - - -
-
kWh
$108
24
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$45,036
Cost:
$9,322
$39,861 399,473 $7,926 1,761 $279 36 $(-3,030) - $39,861
399,473
kWh
$7,926
1,761
MMBtu
$279
36
MMBtu
$(-3,030)
-
$
TOTAL IMPLEMENTED Savings:
$19,635
Cost:
$5,802
$17,270 121,630 $2,386 530 $279 36 $(-300) - $17,270
121,630
kWh
$2,386
530
MMBtu
$279
36
MMBtu
$(-300)
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas Other Energy Administrative Changes Electricity Usage Natural Gas Other Energy Administrative Changes