IAC logo
IAC Assessment: KU0160
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0160
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1985
Principal Product ELECTRONIC COMPONENTS
NAICS n/a
SIC 3678 - Electronic Connectors
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 0
Annual Production 1,500,000 Pieces
Production Hrs. Annual 2,375
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $34,391 473,036 kWh $0.07
Natural Gas $3,229 768 MMBtu $4.20
TOTAL ENERGY COSTS $37,620
RECOMMENDED SAVINGS* $10,081 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,089
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,445
Cost:
$10,000
$5,445 75,029 - - $5,445
75,029
kWh
-
-
MMBtu
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,982
Cost:
$900
$2,259 31,067 $(-277) (-66) $2,259
31,067
kWh
$(-277)
(-66)
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,662
Cost:
$2,000
$1,662 22,860 - - $1,662
22,860
kWh
-
-
MMBtu
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$371
Cost:
$192
$426 5,862 $(-55) (-13) $426
5,862
kWh
$(-55)
(-13)
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$188
Cost:
$60
$213 2,931 $(-25) (-6) $213
2,931
kWh
$(-25)
(-6)
MMBtu
06: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$433
Cost:
$200
- - $433 103 -
-
kWh
$433
103
MMBtu
TOTAL RECOMMENDED Savings:
$10,081
Cost:
$13,352
$10,005 137,749 $76 18 $10,005
137,749
kWh
$76
18
MMBtu
TOTAL IMPLEMENTED Savings:
$9,089
Cost:
$12,900
$9,366 128,956 $(-277) (-66) $9,366
128,956
kWh
$(-277)
(-66)
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas