Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Univ. of Kansas |
---|---|
Assessment Year | 1985 |
Principal Product | FOOD BLEND INGREDIENTS |
NAICS | n/a |
SIC | 2087 - Flavoring Extracts And Syrups, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 52,000,000 Pounds |
Production Hrs. Annual | 5,760 |
Location (State) | KS |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $159,116 | 2,715,123 | kWh | $0.06 |
Natural Gas | $69,024 | 17,377 | MMBtu | $3.97 |
Other Energy | $4,168 | 592 | MMBtu | $7.04 |
TOTAL ENERGY COSTS | $232,308 | |||
RECOMMENDED SAVINGS* | $23,142 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $7,472 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Other Energy | Administrative Changes | Electricity Usage | Natural Gas | Other Energy | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $13,925 Cost: $10,798 |
$13,925 | 237,691 | - | - | - | - | - | - |
$13,925 237,691 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $3,940 Cost: $400 |
$3,348 | 57,151 | $592 | 149 | - | - | - | - |
$3,348 57,151 kWh |
$592 149 MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $3,326 Cost: - |
- | - | $3,426 | 863 | - | - | $(-100) | - |
- - kWh |
$3,426 863 MMBtu |
- - MMBtu |
$(-100) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC |
Savings: $175 Cost: $128 |
- | - | $175 | 44 | - | - | - | - |
- - kWh |
$175 44 MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4312 IMPROVE LUBRICATION PRACTICES |
Savings: $618 Cost: $1,155 |
$618 | 10,551 | - | - | - | - | - | - |
$618 10,551 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $412 Cost: $50 |
$412 | 7,034 | - | - | - | - | - | - |
$412 7,034 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $265 Cost: $416 |
$309 | 5,275 | $(-44) | (-11) | - | - | - | - |
$309 5,275 kWh |
$(-44) (-11) MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $148 Cost: $220 |
$172 | 2,931 | $(-24) | (-6) | - | - | - | - |
$172 2,931 kWh |
$(-24) (-6) MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $206 Cost: $700 |
$206 | 3,517 | - | - | - | - | - | - |
$206 3,517 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.8223 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE |
Savings: $127 Cost: - |
- | - | - | - | $127 | 18 | - | - |
- - kWh |
- - MMBtu |
$127 18 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $23,142 Cost: $13,867 |
$18,990 | 324,150 | $4,125 | 1,039 | $127 | 18 | $(-100) | - | $18,990 324,150 kWh |
$4,125 1,039 MMBtu |
$127 18 MMBtu |
$(-100) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $7,472 Cost: $1,100 |
$3,554 | 60,668 | $4,018 | 1,012 | - | - | $(-100) | - | $3,554 60,668 kWh |
$4,018 1,012 MMBtu |
- - MMBtu |
$(-100) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Other Energy | Administrative Changes | Electricity Usage | Natural Gas | Other Energy | Administrative Changes |