IAC logo
IAC Assessment: KU0180
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0180
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1985
Principal Product FOOD BLEND INGREDIENTS
NAICS n/a
SIC 2087 - Flavoring Extracts And Syrups, Nec
Sales $50,000,000-$100,000,000
# of Employees 100
Plant Area (Sq.Ft.) 0
Annual Production 52,000,000 Pounds
Production Hrs. Annual 5,760
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $159,116 2,715,123 kWh $0.06
Natural Gas $69,024 17,377 MMBtu $3.97
Other Energy $4,168 592 MMBtu $7.04
TOTAL ENERGY COSTS $232,308
RECOMMENDED SAVINGS* $23,142 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,472
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Energy Administrative Changes Electricity Usage Natural Gas Other Energy Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,925
Cost:
$10,798
$13,925 237,691 - - - - - - $13,925
237,691
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$3,940
Cost:
$400
$3,348 57,151 $592 149 - - - - $3,348
57,151
kWh
$592
149
MMBtu
-
-
MMBtu
-
-
$
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$3,326
Cost:
-
- - $3,426 863 - - $(-100) - -
-
kWh
$3,426
863
MMBtu
-
-
MMBtu
$(-100)
-
$
04: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$175
Cost:
$128
- - $175 44 - - - - -
-
kWh
$175
44
MMBtu
-
-
MMBtu
-
-
$
05: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$618
Cost:
$1,155
$618 10,551 - - - - - - $618
10,551
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$412
Cost:
$50
$412 7,034 - - - - - - $412
7,034
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$265
Cost:
$416
$309 5,275 $(-44) (-11) - - - - $309
5,275
kWh
$(-44)
(-11)
MMBtu
-
-
MMBtu
-
-
$
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$148
Cost:
$220
$172 2,931 $(-24) (-6) - - - - $172
2,931
kWh
$(-24)
(-6)
MMBtu
-
-
MMBtu
-
-
$
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$206
Cost:
$700
$206 3,517 - - - - - - $206
3,517
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
10: 2.8223 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE Savings:
$127
Cost:
-
- - - - $127 18 - - -
-
kWh
-
-
MMBtu
$127
18
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$23,142
Cost:
$13,867
$18,990 324,150 $4,125 1,039 $127 18 $(-100) - $18,990
324,150
kWh
$4,125
1,039
MMBtu
$127
18
MMBtu
$(-100)
-
$
TOTAL IMPLEMENTED Savings:
$7,472
Cost:
$1,100
$3,554 60,668 $4,018 1,012 - - $(-100) - $3,554
60,668
kWh
$4,018
1,012
MMBtu
-
-
MMBtu
$(-100)
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas Other Energy Administrative Changes Electricity Usage Natural Gas Other Energy Administrative Changes