IAC Assessment: KU0181
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0181
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1985
Principal Product PLASTIC MOLDED CONTAINER
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 25
Plant Area (Sq.Ft.) 0
Annual Production 2,500,000 Pounds
Production Hrs. Annual 6,168
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $132,623 1,961,899 kWh $0.07
Natural Gas $8,831 2,093 MMBtu $4.22
TOTAL ENERGY COSTS $141,454
RECOMMENDED SAVINGS* $17,952 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,538
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$10,210
Cost:
$1,200
$11,430 169,109 $(-1,220) (-289) - - $11,430
169,109
kWh
$(-1,220)
(-289)
MMBtu
-
-
$
02: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$2,813
Cost:
$750
$2,813 41,618 - - - - $2,813
41,618
kWh
-
-
MMBtu
-
-
$
03: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$1,466
Cost:
$3,000
$1,466 21,688 - - - - $1,466
21,688
kWh
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,446
Cost:
$600
$1,446 21,395 - - - - $1,446
21,395
kWh
-
-
MMBtu
-
-
$
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$891
Cost:
$150
$891 13,189 - - - - $891
13,189
kWh
-
-
MMBtu
-
-
$
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$260
Cost:
-
- - $430 102 $(-170) - -
-
kWh
$430
102
MMBtu
$(-170)
-
$
07: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$688
Cost:
$700
- - $688 163 - - -
-
kWh
$688
163
MMBtu
-
-
$
08: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$178
Cost:
$100
$178 2,638 - - - - $178
2,638
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$17,952
Cost:
$6,500
$18,224 269,637 $(-102) (-24) $(-170) - $18,224
269,637
kWh
$(-102)
(-24)
MMBtu
$(-170)
-
$
TOTAL IMPLEMENTED Savings:
$15,538
Cost:
$2,800
$16,758 247,949 $(-1,220) (-289) - - $16,758
247,949
kWh
$(-1,220)
(-289)
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes