Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Univ. of Kansas |
---|---|
Assessment Year | 1986 |
Principal Product | ADHESIVES,SEALANTS |
NAICS | n/a |
SIC | 2891 - Adhesives And Sealants |
Sales | $10,000,000-$50,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 6,000,000 Pounds |
Production Hrs. Annual | 7,020 |
Location (State) | MO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $81,660 | 1,080,012 | kWh | $0.08 |
Natural Gas | $11,596 | 2,551 | MMBtu | $4.55 |
TOTAL ENERGY COSTS | $93,256 | |||
RECOMMENDED SAVINGS* | $22,816 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $9,064 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $8,265 Cost: $1,500 |
$10,986 | 145,369 | $(-2,721) | (-598) | - | - |
$10,986 145,369 kWh |
$(-2,721) (-598) MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $5,272 Cost: $980 |
$5,272 | 69,754 | - | - | - | - |
$5,272 69,754 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $4,780 Cost: $800 |
$576 | 7,620 | $4,204 | 924 | - | - |
$576 7,620 kWh |
$4,204 924 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,657 Cost: $1,500 |
$1,816 | 24,033 | $(-159) | (-35) | - | - |
$1,816 24,033 kWh |
$(-159) (-35) MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1123 INSTALL AUTOMATIC STACK DAMPER |
Savings: $896 Cost: $725 |
- | - | $896 | 197 | - | - |
- - kWh |
$896 197 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $360 Cost: - |
- | - | $560 | 123 | $(-200) | - |
- - kWh |
$560 123 MMBtu |
$(-200) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED |
Savings: $406 Cost: - |
$288 | 3,810 | $118 | 26 | - | - |
$288 3,810 kWh |
$118 26 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS |
Savings: $396 Cost: $385 |
- | - | $396 | 87 | - | - |
- - kWh |
$396 87 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $215 Cost: $400 |
$288 | 3,810 | $(-73) | (-16) | - | - |
$288 3,810 kWh |
$(-73) (-16) MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.2211 USE OPTIMUM TEMPERATURE |
Savings: $205 Cost: - |
- | - | $205 | 45 | - | - |
- - kWh |
$205 45 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $187 Cost: $172 |
- | - | $187 | 41 | - | - |
- - kWh |
$187 41 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $177 Cost: $30 |
$177 | 2,345 | - | - | - | - |
$177 2,345 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $22,816 Cost: $6,492 |
$19,403 | 256,741 | $3,613 | 794 | $(-200) | - | $19,403 256,741 kWh |
$3,613 794 MMBtu |
$(-200) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $9,064 Cost: $3,612 |
$2,857 | 37,808 | $6,407 | 1,408 | $(-200) | - | $2,857 37,808 kWh |
$6,407 1,408 MMBtu |
$(-200) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes |