IAC logo
IAC Assessment: KU0188
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0188
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1986
Principal Product WALLBOARD PAPER
NAICS n/a
SIC 2621 - Paper Mills
Sales $5,000,000-$10,000,000
# of Employees 100
Plant Area (Sq.Ft.) 0
Annual Production 36,440 Tons
Production Hrs. Annual 7,944
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $735,120 13,153,869 kWh $0.06
Natural Gas $1,221,518 340,259 MMBtu $3.59
TOTAL ENERGY COSTS $1,956,638
RECOMMENDED SAVINGS* $23,338 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,583
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$13,554
Cost:
$680
$13,554 242,380 - - $13,554
242,380
kWh
-
-
MMBtu
02: 2.6232 INSTALL SET-BACK TIMERS Savings:
$2,849
Cost:
$248
$2,849 50,996 - - $2,849
50,996
kWh
-
-
MMBtu
03: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$2,183
Cost:
$900
- - $2,183 608 -
-
kWh
$2,183
608
MMBtu
04: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$3,400
Cost:
$4,600
- - $3,400 947 -
-
kWh
$3,400
947
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,097
Cost:
$100
$1,097 19,637 - - $1,097
19,637
kWh
-
-
MMBtu
06: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$255
Cost:
-
$180 3,224 $75 21 $180
3,224
kWh
$75
21
MMBtu
TOTAL RECOMMENDED Savings:
$23,338
Cost:
$6,528
$17,680 316,237 $5,658 1,576 $17,680
316,237
kWh
$5,658
1,576
MMBtu
TOTAL IMPLEMENTED Savings:
$5,583
Cost:
$5,500
- - $5,583 1,555 -
-
kWh
$5,583
1,555
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas