IAC logo
IAC Assessment: KU0194
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0194
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1986
Principal Product OVERHEAD DOORS
NAICS n/a
SIC 3442 - Metal Doors, Sash, And Trim
Sales $5,000,000-$10,000,000
# of Employees 85
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 2,550
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $13,275 138,921 kWh $0.10
Natural Gas $3,660 800 MMBtu $4.58
Other Energy $64,250 8,031 MMBtu $8.00
TOTAL ENERGY COSTS $81,185
RECOMMENDED SAVINGS* $3,083 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,083
#|Description Savings
Cost
Status Electricity Usage Other Energy Electricity Usage Other Energy
$ kWh $ MMBtu
01: 2.8223 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE Savings:
$1,687
Cost:
-
- - $1,687 211 -
-
kWh
$1,687
211
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,003
Cost:
$1,575
$1,003 10,551 - - $1,003
10,551
kWh
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$393
Cost:
$50
$393 4,103 - - $393
4,103
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$3,083
Cost:
$1,625
$1,396 14,654 $1,687 211 $1,396
14,654
kWh
$1,687
211
MMBtu
TOTAL IMPLEMENTED Savings:
$3,083
Cost:
$1,625
$1,396 14,654 $1,687 211 $1,396
14,654
kWh
$1,687
211
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Other Energy Electricity Usage Other Energy