IAC logo
IAC Assessment: KU0195
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0195
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1986
Principal Product PNEUMATIC TUBE CONVEYORS
NAICS n/a
SIC 3535 - Conveyors And Conveying Equipment
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 0
Annual Production 40 Pieces
Production Hrs. Annual 0
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $39,325 466,002 kWh $0.08
Natural Gas $15,722 3,621 MMBtu $4.34
TOTAL ENERGY COSTS $55,047
RECOMMENDED SAVINGS* $16,861 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,330
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2532 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD Savings:
$2,653
Cost:
$139
$49 586 $2,604 600 - - $49
586
kWh
$2,604
600
MMBtu
-
-
$
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$3,374
Cost:
$14
$272 (-3,224) $3,602 830 $(-500) - $272
(-3,224)
kWh
$3,602
830
MMBtu
$(-500)
-
$
03: 2.7314 REDUCE VENTILATION AIR Savings:
$756
Cost:
$100
$49 586 $707 163 - - $49
586
kWh
$707
163
MMBtu
-
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,705
Cost:
-
$2,205 - - - $(-500) - $2,205
-
kWh
-
-
MMBtu
$(-500)
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$4,203
Cost:
$106
$223 2,638 $3,980 917 - - $223
2,638
kWh
$3,980
917
MMBtu
-
-
$
06: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,360
Cost:
$222
$1,360 16,120 - - - - $1,360
16,120
kWh
-
-
MMBtu
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$964
Cost:
$600
$964 11,430 - - - - $964
11,430
kWh
-
-
MMBtu
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$148
Cost:
$200
$148 1,758 - - - - $148
1,758
kWh
-
-
MMBtu
-
-
$
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$124
Cost:
$200
$124 1,465 - - - - $124
1,465
kWh
-
-
MMBtu
-
-
$
10: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$229
Cost:
-
- - $299 69 $(-70) - -
-
kWh
$299
69
MMBtu
$(-70)
-
$
11: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$456
Cost:
$700
- - $456 105 - - -
-
kWh
$456
105
MMBtu
-
-
$
12: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$495
Cost:
$200
$495 5,862 - - - - $495
5,862
kWh
-
-
MMBtu
-
-
$
13: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$272
Cost:
-
$272 3,224 - - - - $272
3,224
kWh
-
-
MMBtu
-
-
$
14: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$122
Cost:
-
- - $122 28 - - -
-
kWh
$122
28
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$16,861
Cost:
$2,481
$6,161 40,445 $11,770 2,712 $(-1,070) - $6,161
40,445
kWh
$11,770
2,712
MMBtu
$(-1,070)
-
$
TOTAL IMPLEMENTED Savings:
$13,330
Cost:
$2,242
$6,063 39,273 $8,337 1,921 $(-1,070) - $6,063
39,273
kWh
$8,337
1,921
MMBtu
$(-1,070)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes