IAC logo
IAC Assessment: KU0201
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0201
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1986
Principal Product METAL HAND RAILINGS
NAICS n/a
SIC 3446 - Architectural Metal Work
Sales $5,000,000-$10,000,000
# of Employees 110
Plant Area (Sq.Ft.) 0
Annual Production 1,040,000 Pounds
Production Hrs. Annual 2,210
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $40,793 491,794 kWh $0.08
Natural Gas $26,525 6,921 MMBtu $3.83
TOTAL ENERGY COSTS $67,318
RECOMMENDED SAVINGS* $12,205 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,663
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$2,771
Cost:
$5,500
$2,771 33,411 - - - - $2,771
33,411
kWh
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,677
Cost:
$1,581
$1,677 20,223 - - - - $1,677
20,223
kWh
-
-
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,483
Cost:
$120
$1,483 17,878 - - - - $1,483
17,878
kWh
-
-
MMBtu
-
-
$
04: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$1,460
Cost:
$2,135
$1,460 17,585 - - - - $1,460
17,585
kWh
-
-
MMBtu
-
-
$
05: 2.2532 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD Savings:
$1,243
Cost:
$90
$186 2,345 $1,057 276 - - $186
2,345
kWh
$1,057
276
MMBtu
-
-
$
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$1,118
Cost:
$2,100
- - $1,118 292 - - -
-
kWh
$1,118
292
MMBtu
-
-
$
07: 2.2532 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD Savings:
$740
Cost:
$10
$144 1,758 $596 156 - - $144
1,758
kWh
$596
156
MMBtu
-
-
$
08: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$173
Cost:
$1,500
$216 2,638 $(-43) (-11) - - $216
2,638
kWh
$(-43)
(-11)
MMBtu
-
-
$
09: 2.6214 SHUT OFF PILOTS IN STANDBY EQUIPMENT Savings:
$590
Cost:
-
- - $540 141 $50 - -
-
kWh
$540
141
MMBtu
$50
-
$
10: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$480
Cost:
$50
$480 5,862 - - - - $480
5,862
kWh
-
-
MMBtu
-
-
$
11: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$155
Cost:
-
$155 1,758 - - - - $155
1,758
kWh
-
-
MMBtu
-
-
$
12: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$177
Cost:
$200
$177 2,052 - - - - $177
2,052
kWh
-
-
MMBtu
-
-
$
13: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$138
Cost:
-
$138 1,758 - - - - $138
1,758
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$12,205
Cost:
$13,286
$8,887 107,268 $3,268 854 $50 - $8,887
107,268
kWh
$3,268
854
MMBtu
$50
-
$
TOTAL IMPLEMENTED Savings:
$7,663
Cost:
$4,136
$5,420 65,357 $2,193 573 $50 - $5,420
65,357
kWh
$2,193
573
MMBtu
$50
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes