IAC logo
IAC Assessment: KU0206
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0206
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1986
Principal Product PAPER BOXES
NAICS n/a
SIC 2657 - Folding Paperboard Boxes
Sales $5,000,000-$10,000,000
# of Employees 60
Plant Area (Sq.Ft.) 0
Annual Production 160,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $79,036 1,010,844 kWh $0.08
Natural Gas $15,075 3,751 MMBtu $4.02
Fuel Oil #2 $8,000 1,120 MMBtu $7.14
TOTAL ENERGY COSTS $102,111
RECOMMENDED SAVINGS* $32,284 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,548
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$16,289
Cost:
$5,696
$16,289 208,382 - - - - - - $16,289
208,382
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$4,313
Cost:
$107
$1,535 19,637 $2,778 691 - - - - $1,535
19,637
kWh
$2,778
691
MMBtu
-
-
MMBtu
-
-
$
03: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$2,935
Cost:
$1,500
- - $2,935 730 - - - - -
-
kWh
$2,935
730
MMBtu
-
-
MMBtu
-
-
$
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$2,243
Cost:
-
$2,428 31,067 $515 128 - - $(-700) - $2,428
31,067
kWh
$515
128
MMBtu
-
-
MMBtu
$(-700)
-
$
05: 2.7312 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE Savings:
$2,155
Cost:
$4,000
- - $2,155 536 - - - - -
-
kWh
$2,155
536
MMBtu
-
-
MMBtu
-
-
$
06: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$1,718
Cost:
$1,515
$1,718 21,981 - - - - - - $1,718
21,981
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$641
Cost:
-
$641 8,206 - - - - - - $641
8,206
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
08: 2.6214 SHUT OFF PILOTS IN STANDBY EQUIPMENT Savings:
$474
Cost:
-
- - $434 108 - - $40 - -
-
kWh
$434
108
MMBtu
-
-
MMBtu
$40
-
$
09: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$979
Cost:
-
- - $679 169 - - $300 - -
-
kWh
$679
169
MMBtu
-
-
MMBtu
$300
-
$
10: 2.8223 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE Savings:
$239
Cost:
-
- - - - $239 34 - - -
-
kWh
-
-
MMBtu
$239
34
MMBtu
-
-
$
11: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$183
Cost:
$100
$183 2,345 - - - - - - $183
2,345
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
12: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$115
Cost:
-
$115 1,465 - - - - - - $115
1,465
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$32,284
Cost:
$12,918
$22,909 293,083 $9,496 2,362 $239 34 $(-360) - $22,909
293,083
kWh
$9,496
2,362
MMBtu
$239
34
MMBtu
$(-360)
-
$
TOTAL IMPLEMENTED Savings:
$24,548
Cost:
$7,403
$18,122 231,829 $6,147 1,529 $239 34 $40 - $18,122
231,829
kWh
$6,147
1,529
MMBtu
$239
34
MMBtu
$40
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes