IAC Assessment: KU0209
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0209
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1986
Principal Product WIRE AND WIRE ROPES
NAICS n/a
SIC 3315 - Steel Wire And Related Products
Sales $50,000,000-$100,000,000
# of Employees 550
Plant Area (Sq.Ft.) 0
Annual Production 50,000 Tons
Production Hrs. Annual 6,600
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,276,577 27,941,384 kWh $0.05
Natural Gas $552,951 184,778 MMBtu $2.99
TOTAL ENERGY COSTS $1,829,528
RECOMMENDED SAVINGS* $143,121 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,370
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$37,717
Cost:
$30,000
- - $37,717 12,614 - - -
-
kWh
$37,717
12,614
MMBtu
-
-
$
02: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$23,084
Cost:
$20,000
$23,084 505,276 - - - - $23,084
505,276
kWh
-
-
MMBtu
-
-
$
03: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$19,573
Cost:
$13,500
- - $19,573 6,546 - - -
-
kWh
$19,573
6,546
MMBtu
-
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$25,756
Cost:
$5,000
- - $25,756 8,614 - - -
-
kWh
$25,756
8,614
MMBtu
-
-
$
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$11,981
Cost:
$20,000
- - $14,681 4,910 $(-2,700) - -
-
kWh
$14,681
4,910
MMBtu
$(-2,700)
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$9,092
Cost:
-
$9,092 199,004 - - - - $9,092
199,004
kWh
-
-
MMBtu
-
-
$
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$3,611
Cost:
$945
$1,138 24,912 $2,473 827 - - $1,138
24,912
kWh
$2,473
827
MMBtu
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,187
Cost:
$5,000
$3,187 69,754 - - - - $3,187
69,754
kWh
-
-
MMBtu
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,209
Cost:
$3,372
$2,209 48,359 - - - - $2,209
48,359
kWh
-
-
MMBtu
-
-
$
10: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,842
Cost:
$8,000
- - $1,842 616 - - -
-
kWh
$1,842
616
MMBtu
-
-
$
11: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,687
Cost:
$7,500
$1,687 36,928 - - - - $1,687
36,928
kWh
-
-
MMBtu
-
-
$
12: 2.6214 SHUT OFF PILOTS IN STANDBY EQUIPMENT Savings:
$809
Cost:
-
- - $909 304 $(-100) - -
-
kWh
$909
304
MMBtu
$(-100)
-
$
13: 2.1232 KEEP BOILER TUBES CLEAN Savings:
$796
Cost:
$1,600
- - $846 283 $(-50) - -
-
kWh
$846
283
MMBtu
$(-50)
-
$
14: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$736
Cost:
$50
$736 16,120 - - - - $736
16,120
kWh
-
-
MMBtu
-
-
$
15: 2.1222 INSTALL TURBULATORS Savings:
$392
Cost:
$2,500
- - $392 131 - - -
-
kWh
$392
131
MMBtu
-
-
$
16: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$353
Cost:
$50
- - $353 118 - - -
-
kWh
$353
118
MMBtu
-
-
$
17: 2.4227 USE COMPRESSOR AIR FILTERS Savings:
$161
Cost:
$50
$201 4,396 - - $(-40) - $201
4,396
kWh
-
-
MMBtu
$(-40)
-
$
18: 2.1242 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT Savings:
$135
Cost:
-
- - $135 45 - - -
-
kWh
$135
45
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$143,121
Cost:
$117,567
$41,334 904,749 $104,677 35,008 $(-2,890) - $41,334
904,749
kWh
$104,677
35,008
MMBtu
$(-2,890)
-
$
TOTAL IMPLEMENTED Savings:
$24,370
Cost:
$33,567
$7,471 163,541 $19,789 6,618 $(-2,890) - $7,471
163,541
kWh
$19,789
6,618
MMBtu
$(-2,890)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes