IAC logo
IAC Assessment: KU0236
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0236
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1987
Principal Product AUTOMOTIVE REPAIR TOOLS
NAICS n/a
SIC 3537 - Industrial Trucks And Tractors
Sales $10,000,000-$50,000,000
# of Employees 225
Plant Area (Sq.Ft.) 0
Annual Production 4,000,000 Pieces
Production Hrs. Annual 4,250
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $112,285 1,526,964 kWh $0.07
Natural Gas $24,027 7,039 MMBtu $3.41
TOTAL ENERGY COSTS $136,312
RECOMMENDED SAVINGS* $11,625 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,264
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,730
Cost:
$8,946
$5,730 77,960 - - - - $5,730
77,960
kWh
-
-
MMBtu
-
-
$
02: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$1,183
Cost:
$1,700
- - $1,183 347 - - -
-
kWh
$1,183
347
MMBtu
-
-
$
03: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$1,055
Cost:
-
$1,055 14,361 - - - - $1,055
14,361
kWh
-
-
MMBtu
-
-
$
04: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$905
Cost:
-
$905 12,309 - - - - $905
12,309
kWh
-
-
MMBtu
-
-
$
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$725
Cost:
-
- - $1,225 359 $(-500) - -
-
kWh
$1,225
359
MMBtu
$(-500)
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$388
Cost:
-
$388 5,275 - - - - $388
5,275
kWh
-
-
MMBtu
-
-
$
07: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$691
Cost:
$1,000
$862 11,723 $(-171) (-50) - - $862
11,723
kWh
$(-171)
(-50)
MMBtu
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$582
Cost:
$120
$582 7,913 - - - - $582
7,913
kWh
-
-
MMBtu
-
-
$
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$194
Cost:
$40
$194 2,638 - - - - $194
2,638
kWh
-
-
MMBtu
-
-
$
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$172
Cost:
$120
$172 2,345 - - - - $172
2,345
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$11,625
Cost:
$11,926
$9,888 134,524 $2,237 656 $(-500) - $9,888
134,524
kWh
$2,237
656
MMBtu
$(-500)
-
$
TOTAL IMPLEMENTED Savings:
$8,264
Cost:
$9,186
$7,539 102,579 $1,225 359 $(-500) - $7,539
102,579
kWh
$1,225
359
MMBtu
$(-500)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes