IAC Assessment: KU0254
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0254
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1988
Principal Product HEAVY COMMERCIAL TRUCKS
NAICS n/a
SIC 3537 - Industrial Trucks And Tractors
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 0
Annual Production 750 Pieces
Production Hrs. Annual 4,420
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $163,285 2,110,199 kWh $0.08
Natural Gas $45,414 11,517 MMBtu $3.94
TOTAL ENERGY COSTS $208,699
RECOMMENDED SAVINGS* $12,968 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,971
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,185
Cost:
$2,000
$3,185 41,618 - - $3,185
41,618
kWh
-
-
MMBtu
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$191
Cost:
-
$159 2,052 $32 8 $159
2,052
kWh
$32
8
MMBtu
03: 2.2532 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD Savings:
$1,539
Cost:
-
$46 586 $1,493 379 $46
586
kWh
$1,493
379
MMBtu
04: 2.7441 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH Savings:
$1,773
Cost:
$1,800
- - $1,773 450 -
-
kWh
$1,773
450
MMBtu
05: 2.6214 SHUT OFF PILOTS IN STANDBY EQUIPMENT Savings:
$347
Cost:
-
- - $347 88 -
-
kWh
$347
88
MMBtu
06: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$2,033
Cost:
$2,125
- - $2,033 516 -
-
kWh
$2,033
516
MMBtu
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,741
Cost:
$1,680
$3,741 48,359 - - $3,741
48,359
kWh
-
-
MMBtu
08: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$159
Cost:
-
$159 2,052 - - $159
2,052
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$12,968
Cost:
$7,605
$7,290 94,667 $5,678 1,441 $7,290
94,667
kWh
$5,678
1,441
MMBtu
TOTAL IMPLEMENTED Savings:
$8,971
Cost:
$3,680
$7,131 92,615 $1,840 467 $7,131
92,615
kWh
$1,840
467
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas