IAC logo
IAC Assessment: KU0261
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0261
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1988
Principal Product CUSTOM INJECT MOLDED PTS
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 6,240
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $417,418 7,077,081 kWh $0.06
Natural Gas $7,102 1,718 MMBtu $4.13
TOTAL ENERGY COSTS $424,520
RECOMMENDED SAVINGS* $68,225 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$43,671
Cost:
-
$43,671 - $43,671
-
kWh
02: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$7,119
Cost:
$14,000
$7,119 120,750 $7,119
120,750
kWh
03: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$3,957
Cost:
$2,400
$3,957 67,116 $3,957
67,116
kWh
04: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM Savings:
$4,268
Cost:
$2,000
$4,268 72,392 $4,268
72,392
kWh
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$743
Cost:
$400
$743 12,603 $743
12,603
kWh
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,683
Cost:
$7,109
$4,683 79,426 $4,683
79,426
kWh
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,592
Cost:
$3,600
$2,592 43,962 $2,592
43,962
kWh
08: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$1,192
Cost:
-
$1,192 20,223 $1,192
20,223
kWh
TOTAL RECOMMENDED Savings:
$68,225
Cost:
$29,509
$68,225 416,472 $68,225
416,472
kWh
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - -
-
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage