IAC logo
IAC Assessment: KU0266
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0266
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1988
Principal Product ANIMAL VACCINES, SERUMS
NAICS n/a
SIC 2836 - Biological Products Exc. Diagnostic
Sales $5,000,000-$10,000,000
# of Employees 60
Plant Area (Sq.Ft.) 0
Annual Production 45,000,000 Pieces
Production Hrs. Annual 2,460
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $109,860 2,378,957 kWh $0.05
Natural Gas $24,760 6,785 MMBtu $3.65
TOTAL ENERGY COSTS $134,620
RECOMMENDED SAVINGS* $17,378 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,470
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$487
Cost:
$282
$487 10,551 - - - - $487
10,551
kWh
-
-
MMBtu
-
-
$
02: 2.7312 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE Savings:
$8,274
Cost:
$1,008
$1,854 40,152 $6,420 1,759 - - $1,854
40,152
kWh
$6,420
1,759
MMBtu
-
-
$
03: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$3,166
Cost:
$7,300
$3,166 68,581 - - - - $3,166
68,581
kWh
-
-
MMBtu
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,624
Cost:
$100
$1,624 35,170 - - - - $1,624
35,170
kWh
-
-
MMBtu
-
-
$
05: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$791
Cost:
$860
- - - - $791 - -
-
kWh
-
-
MMBtu
$791
-
$
06: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$1,336
Cost:
$1,300
- - $1,336 366 - - -
-
kWh
$1,336
366
MMBtu
-
-
$
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$898
Cost:
$1,500
- - $898 246 - - -
-
kWh
$898
246
MMBtu
-
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$406
Cost:
$580
$406 8,792 - - - - $406
8,792
kWh
-
-
MMBtu
-
-
$
09: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$396
Cost:
$580
- - - - $396 - -
-
kWh
-
-
MMBtu
$396
-
$
TOTAL RECOMMENDED Savings:
$17,378
Cost:
$13,510
$7,537 163,246 $8,654 2,371 $1,187 - $7,537
163,246
kWh
$8,654
2,371
MMBtu
$1,187
-
$
TOTAL IMPLEMENTED Savings:
$12,470
Cost:
$4,330
$3,965 85,873 $7,318 2,005 $1,187 - $3,965
85,873
kWh
$7,318
2,005
MMBtu
$1,187
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes