IAC logo
IAC Assessment: KU0277
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0277
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1989
Principal Product PRINTED CIRCUIT BOARDS
NAICS n/a
SIC 3672 - Printed Circuit Boards
Sales $5,000,000-$10,000,000
# of Employees 105
Plant Area (Sq.Ft.) 0
Annual Production 374 Thousand Feet
Production Hrs. Annual 8,400
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $90,209 1,559,789 kWh $0.06
Natural Gas $8,474 2,124 MMBtu $3.99
TOTAL ENERGY COSTS $98,683
RECOMMENDED SAVINGS* $22,337 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7314 REDUCE VENTILATION AIR Savings:
$7,959
Cost:
$2,250
$6,539 113,130 $1,420 356 $6,539
113,130
kWh
$1,420
356
MMBtu
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$6,065
Cost:
$2,775
$6,065 104,924 - - $6,065
104,924
kWh
-
-
MMBtu
03: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$2,439
Cost:
$3,600
$2,439 42,204 - - $2,439
42,204
kWh
-
-
MMBtu
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,101
Cost:
$2,112
$2,101 36,342 - - $2,101
36,342
kWh
-
-
MMBtu
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,474
Cost:
$300
$1,474 25,498 - - $1,474
25,498
kWh
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$390
Cost:
$766
$390 6,741 - - $390
6,741
kWh
-
-
MMBtu
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$948
Cost:
-
$948 16,413 - - $948
16,413
kWh
-
-
MMBtu
08: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$504
Cost:
$700
$711 12,309 $(-207) (-52) $711
12,309
kWh
$(-207)
(-52)
MMBtu
09: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$457
Cost:
-
$457 7,913 - - $457
7,913
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$22,337
Cost:
$12,503
$21,124 365,474 $1,213 304 $21,124
365,474
kWh
$1,213
304
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas